Design - Manufacturing - Installation - Maintenance
- Engineering Design——About 30 days (one month)
- Material Production Cycle - About 90 days (three months)
- Shipping——Usually takes about 30 days (one month)
- Construction Installation——If the civil engineering is fully completed, about 60 days (two months) are required