Assembled the frame
Negotiable
China
West side of Dongchang Road and south side of Lanhe Street, Jingjinzhouhe Science and Technology Industrial Park, Jizhou District, Tianjin
+86 022-29807188
Online Contact
Favorite
Product Introduction

The assembled frame is divided into two parts: the column and the upper and lower frames, which effectively reduces storage space and saves inventory and transportation costs.

The assembly plug-in used in the frame cleverly divides the ordinary cast steel plug-in into three closely connected individuals, and the frame reaches the load-bearing standard of the ordinary 18-fold welded frame through the M12 threaded connection. It has the characteristics of high load-bearing, high protection level, strong anti-corrosion performance and long service life. The frame itself is simple and flexible, helping you to quickly assemble a perfect frame through the instructions.

Static load-bearing: 2000kg