PKP LHS Moves Forward With Broad-Gauge Capacity Work in Podkarpacie
2025-01-03 11:55
Favorite

Wedoany.com Report-Jan 3, The final objective is to create conditions that allow dispatchers to handle train movements from within a centralized facility.

PKP LHS, the manager of broad-gauge infrastructure in Poland, plans to extend the Huta Deręgowska LHS passing loop and install automatic traffic control systems at Wola Baranowska LHS station. The contract was awarded to a consortium of companies from Bytom and Radom, and covers technological upgrades intended to streamline freight movements over nearly 100 km of track.

Part of the project involves establishing a Local Control Centre at Wola Baranowska LHS, constructing a new control room, and deploying computerized traffic management equipment. These elements are intended to cut down on the time needed to receive and dispatch trains, reduce on-track pedestrian movement, and increase workplace safety. The station’s track system will be refurbished, with electric heating on turnouts for continued operations in challenging winter conditions. Plans also include a new access road and additional station lighting.

The entire investment exceeds EUR 34 million. By integrating remote traffic control along the broad-gauge line, operators aim to oversee movement from a single point, offering higher flexibility for customers. According to available information, PKP LHS is experiencing a growth in traffic from Ukraine and has chosen to modernize sections of the network in response.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com