Romania Energy Storage Project Completes 120 MWh Power Transmission
2026-06-15 18:05
Favorite

en.Wedoany.com Reported - Romanian tech company Visual Fan, through its Allview Energy division, has completed the Teiuș battery energy storage system project and initiated power transmission. Located in Teiuș, Alba County, this Romanian energy storage project has a capacity of 120 MWh and is owned by Teiuș Solar, a subsidiary of Danish renewable energy group Eurowind Energy.

Visual Fan was responsible for the full engineering, procurement, and construction (EPC) work for this Romanian energy storage project, covering design, procurement, construction, installation, technical integration, testing, and commissioning. The project contract value exceeds €16.6 million, part of Eurowind Energy's €21 million investment in this 120 MWh storage system, supported by funding from Romania's National Recovery and Resilience Plan.

The on-site battery system has been integrated and tested, with power transmission notifications received from the distribution operator and transmission system operator. This Romanian energy storage project is now being prepared for commercial operation, primarily aimed at enhancing grid flexibility, absorbing surplus renewable energy, and releasing power when the system requires it. With the completion of power transmission for the 120 MWh storage system, Romania has added a new engineering case in battery storage and renewable energy grid integration regulation.

This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com