| Notice Type | Tender Announcement |
|---|---|
| Announcement No. | CEZB260601424 |
| Description |
Project Name: Public Tender for the Rapid Switching Retrofit of Raw Coal Bunker to Furnace Coal for Unit 6 Boiler at Zhejiang Company Beilun Power Plant Tender Number: CEZB260601424 Project Overview: The China Energy Beilun Power Plant is located in Beilun District, Ningbo City, Zhejiang Province. Its Phase III project (Units 6 and 7) consists of two ultra-supercritical coal-fired units, each with a single-unit capacity of 1050MW. To adapt to the current situation of tight coal supply and complex, variable coal types, a retrofit of the 6A raw coal bunker for Unit 6 boiler is planned. Tender Scope: By installing a central partition wall and bidirectional electric slide gate valves in the 6A raw coal bunker, the project aims to enable single-bunk storage of two different calorific value coal types with rapid switching, thereby enhancing coal blending and combustion capability and unit peaking flexibility. Concurrently, the bunker liner will be replaced from microcrystalline plate to 304 stainless steel liner. The project includes all aspects such as procurement and supply, fabrication installation, on-site construction, commissioning, and training. Project Duration: The total duration is 50 days, planned to be implemented during the unit maintenance period from April 2 to June 10, 2026. The actual commencement date is subject to the written notice from the Tenderee. Project Location: No. 66 Jingang West Road, Beilun District, Ningbo City, Zhejiang Province. Source of Funds: Self-raised by the enterprise. Bidder Qualification Requirements: Must be an independent legal entity duly registered, providing valid supporting documents. Must possess a valid Grade 3 or above Power Engineering Construction General Contracting qualification certificate. Must possess a valid Work Safety Permit. Performance Requirements: From February 2021 to the bid submission deadline (based on contract signing date), the bidder must have at least 2 completed contract performances for raw coal bunker compartmentalization retrofit in thermal power units with a single-unit capacity of 600MW or above. Scanned copies of the contracts (including key information pages) and proof documents stamped by the end-user are required. Project Manager Requirements: Must possess a valid Grade 2 or above Constructor Registration Certificate (in Construction Engineering or Mechanical & Electrical Engineering) and a Work Safety Assessment Certificate (Category B). Must have at least 1 performance as project manager for a raw coal bunker compartmentalization retrofit project in a thermal power unit of 600MW or above (requiring stamped materials such as contracts or acceptance certificates). Safety Officer Requirements: Must possess a valid Work Safety Assessment Certificate (Category C). Consortium Bidding: Consortium bidding is not accepted for this project. Tender Document Acquisition: Purchase Method: Bidders must complete registration on the National Energy Group Ecosystem Collaboration Platform and then log in to the "Guoneng e-Bid Bidder Business System" to make an online purchase. Purchase Period: March 5, 2026, 09:00 to March 10, 2026, 16:00. Document Price: RMB 70 per package, non-refundable after sale. Bid Submission and Opening: Bid Submission Method: This project adopts fully electronic tendering. Bidders must use the "Guoneng e-Bid Tender Document Preparation Tool" to prepare bid documents and submit encrypted electronic bid files via the "Guoneng e-Bid Bidder Business System" before the bid submission deadline. Bid Opening Method: No on-site bid opening will be held. The bid opening will be conducted publicly via the "Guoneng e-Bid Bidder Business System". Special Instructions: Bidders must obtain a CA digital certificate to complete the bidding process. During the bid opening stage and the stage of publicizing the winning candidate(s), information regarding the bidder's qualifications, performance, and project manager's certificates will be made public. Any performance not publicly disclosed will not be recognized. |
| File |
Expired Tender for the Rapid Switching Retrofit Project for Raw Coal Bunker to Furnace Coal at China Energy Zhejiang Company Beilun Third Power Generation Co., Ltd.
| Organization | Guoneng Zhejiang Beilun No.3 Power Generation Co., Ltd. | Country | China |
|---|---|---|---|
| Contact | Mr. Kang | Tel. | View more |
| View more | Address | No. 66 Jingang West Road, Beilun District, Ningbo City, Zhejiang Province | |
| Release Date | 2026-03-05 | Validity | 2026-03-25 |
Details
The tender information on this website is provided for reference only. If you intend to bid, please verify the authenticity and accuracy of the information with the tendering party. Our company reserves the right to adjust website content at any time and assumes no direct or indirect liability for it.Email: news@wedoany.com
Related Tenders
1
Thailand's Electricity Generating Authority (EGAT) Transformer Procurement Tender
[2026-03-26]
2
Procurement Tender for Photovoltaic Power Station Installation by Vilniaus Vandenys, UAB, Lithuania
[2026-03-24]
3
Tender for the Procurement of Disconnectors by the Lithuanian Electricity Grid Company
[2026-03-11]
Related Products
Pneumatic high-pressure wear-resistant ball valve
Negotiable /unit (starting from)
72.5kV 1250A 31.5kA SF6 free Gas-insulated Metal-enclosed Switchgear
Negotiable
TAI Slew-drive Single-axis Independent 1P Tracking Bracket System
Negotiable
Standard Nozzle Flowmeter
Negotiable
Combined honeycomb ceramic
Negotiable
Green Wind Power
Negotiable
Weichai Land-based Diesel Genset WPG110F1
Negotiable
Integrated Photovoltaic Energy Storage System
Negotiable
VEG-12/24/40.5 Series Vacuum Circuit Breaker
Negotiable
Modular Multifunctional Water Supply and Drainage Vehicle (18T)
Negotiable
Double flow slab caster
Negotiable
G.652.D Wavelength-extended Non-dispersion Shifted Single-mode Optical Fiber
Negotiable