Expired Tender Announcement for Concrete Tower, Anchorage System, and Steel Cable Construction Project in Nueva Vizcaya, Philippines

Organization MUNICIPALITY OF DUPAX DEL NORTE, NUEVA VIZCAYA Country Philippines
Contact Tel. Click to view
E-mail Click to view Address Nerio D Fragata Supervising Administrative Officer Dupax del Norte Dupax Del Norte Nueva Vizcaya Phi Nueva Vizcaya
Release Date 2026-03-19 Validity 2026-03-23
Details
Notice Type Tender Announcement
Notice No. 12839608
Description

Project Title: Construction of Suspension Bridge at Lower Centro

Delivery Region: Nueva Vizcaya

Project Name: Concrete Tower and Anchorage System Construction Project

Project Location: Lower Centro, Binuangan, Dupax del Norte, Nueva Vizcaya, Philippines

Project Budget: PHP 954,901.82

Funding Source: Municipal Disaster Risk Reduction and Management Fund 2025 (MDRRMF 2025)

Project Content and Scope of Work:

Concrete Tower Construction: Construction of two concrete towers (A and B) to serve as support structures for steel cables.

Anchorage System Construction: Construction of two deadman anchor towers (A/B), i.e., gravity anchorages, for securing the ends of the steel cables.

Steel Cable Installation: Installation of steel cables with diameters of 25mm (top), 20mm (middle), and 25mm (bottom) to form a complete cable structure system.

Item Information:

Steel Cable System:

Top Cable: Diameter 25mm, for upper anchorage.

Middle Cable: Diameter 20mm, for mid-span connection.

Bottom Cable: Diameter 25mm, for lower anchorage.

Anchorage System:

Deadman Anchor Towers (Two, A/B): Gravity-type concrete anchorage structures providing fixed points for cable ends.

Associated Rigging Products (Inferred based on project needs):

Cable Anchors (Anchorage Devices): For connecting and securing cables to concrete towers and deadman anchor towers.

Cable Clamps: For positioning, fixing, and preventing slippage of cables.

Strand Anchors: Force-bearing connection components for cable ends (including anchor plates, wedges, nuts, etc.).

Support Structures:

Concrete Towers (Two, A/B): Reinforced concrete structures serving as upper support points for the cables.

Technical Parameters and Requirements (Inferred):

Concrete Strength Grade: Designed according to anchorage force requirements, typically not lower than C25.

Cable Material: High-strength galvanized steel wire rope, compliant with international standards (e.g., ISO 2408, GB/T 8918).

Anchor Performance Grade: Wedge-type anchors matching the cable diameter, with a static load anchoring efficiency coefficient ≥0.95.

Corrosion Protection Requirements: Cables and metal fittings require galvanizing or epoxy coating for corrosion protection.

Design Loads: Must satisfy local wind load, seismic load, and service load requirements.

Scope of Services (Inferred):

Supply Scope: Provision of steel cables, anchors, cable clamps, and related accessories meeting specifications.

Construction Scope: Civil construction of concrete towers and anchor towers, cable installation, tensioning, and commissioning.

Technical Support: Provision of anchorage system design verification, installation guidance, and tensioning process guidance.

Quality Control: Material inspection, construction process supervision, and post-tensioning acceptance.

Warranty Service: Provision of structural warranty and corrosion protection warranty for a specified period.

Project Background and Purpose (Inferred):

Disaster Reduction and Prevention Purpose: Funded by the Municipal Disaster Risk Reduction and Management Fund, this project may be for disaster mitigation works such as landslide prevention, riverbank reinforcement, or infrastructure protection.

Cable Structure Application: The concrete towers, steel cables, and anchorage system form a retaining structure, protective net system, or cable-supported system.

Budget Composition (Estimated):

Material Costs (steel cables, anchors, concrete, rebar, etc.)

Construction Costs (civil works, installation, tensioning)

Equipment Rental Fees (if applicable)

Transportation Costs

Taxes and Project Management Fees

Documents Attachment.pdf (120.31 K)
The tender information on this website is provided for reference only. If you intend to bid, please verify the authenticity and accuracy of the information with the tendering party. Our company reserves the right to adjust website content at any time and assumes no direct or indirect liability for it.Email: news@wedoany.com