The project was completed and put into operation in 2022. It adopts phosphorus tailings backfill comprehensive utilization technology for design, employing an economically feasible, low-cost, safe, and environmentally friendly full-tailings backfill process for treating goaf and ecological restoration. The phosphorus tailings are processed to meet Class I solid waste discharge standards. The process is simple, feasible, and extremely low-cost. The treated tailings that meet Class I solid waste discharge standards can be stacked anywhere without the need for impermeable membranes, enabling ecological restoration of open-pit mining pits, effectively reducing tailings storage costs, and saving maintenance expenses for tailings ponds.
1/1
Yingping Mining Section Open-pit Tailings Backfill Treatment of Goaf Ecological Restoration EPC Project
Negotiable
China
No. 51 Chaoyang West Road, Haizhou District, Lianyungang City, Jiangsu Province
+86 0518-85520192
zhangruijie1@sinochem.com
Product Introduction
Other products from this supplier

Negotiable
Lianyungang Xuwei Reclaimed Water Plant Project (Phase I)

Negotiable
Lianyungang Petrochemical Base Chemical High-salinity Wastewater Treatment Project (Phase II)

Negotiable
Lianyungang Petrochemical Base Industrial Wastewater Third-party Treatment Project (Phase III)

Negotiable
Qinghai Salt Lake Battery-grade Lithium Carbonate Project

Negotiable
Uzbekistan Dehkanabad Potash Fertilizer Plant Potash Project

Negotiable
SDIC Luobupo Potash Sulfate Expansion Mining and Transportation Project

Negotiable
Saudi Arabia Umm Wu'al Phosphate Ore Beneficiation Plant Project

Negotiable
Yunnan Phosphorus Chemical Group Co., Ltd. 2 Million t/a Phosphorus Ore Mining and Beneficiation Project

Negotiable
Nantong Xingchen New Materials Industrial Base Phase II Waste Gas Treatment Project
Related Products
Malaysia EMPP Gas Power Plant
Negotiable
TAI Slew-drive Single-axis Independent 1P Tracking Bracket System
Negotiable
KYN28A-12 Metal Armored Removable Switchgear
Negotiable
Double Extraction Condensing Steam Turbine
Negotiable
KYN61-40.5 Switchgear
Negotiable
N-Type TOPCon Double-sided Cell HG183
Negotiable
NISELA Series Environmentally Friendly Gas-Insulated Ring Main Unit
Negotiable
Double-slide Triple-sealed Hot Air Isolation Door
Negotiable
Telescopic Arm Iron Roughneck
Negotiable
Off-Grid Fuel Cell Supercharging Station (180kW Configuration)
Negotiable
220kV Composite Outdoor Cable Terminal
Negotiable
Aero Piston Engine - FF600 Two-Stroke Opposed Two-Cylinder Engine
Negotiable
