T-Type Boarding Bridge

Negotiable
China
No.9, Fuyuan 2nd Road, Fuhai Street, Bao'an District, Shenzhen City, Guangdong Province
86 755 26688488
Online Contact
Favorite
Product Introduction

The lifting column of the T-type boarding bridge is fixed on the apron. A telescopic oil cylinder is installed under the T-channel directly connected to the aircraft interface, which can extend the aircraft interface to connect with the aircraft or retract it to the parked bridge state. The main channel and T-channel are arranged in a 90-degree T-shape.