RFQ No.: RFQ #051/2026
Reference No.: PR#328/26
Buyer: General Petroleum Company C/O Scimitar Production Egypt Ltd.
Location: Cairo, Egypt
Published Date: 10 June 2026
Closing Date: 18 June 2026
Closing Time: 12:00 PM
Time Zone: Cairo Time, UTC+2
1. Procurement Scope
Scimitar Production Egypt Ltd. invites qualified suppliers to submit quotations for the supply of Heavy Oil Pump, quantity 5 sets.
Item Description:
HEAVY OIL PUMP 89-70/38TH5.6/1.2-0.9/5.1PZ
Stroke Length: 4m
2 3/4” × 1 1/2”
For 3.5” TBG
Code: 30-275/150PF
Quantity: 5 EA / 5 Sets
2. Technical Requirements
The offered products shall comply with the RFQ documents and attached technical information.
Key reference requirements include:
- Product type: Heavy Oil Pump
- Application: Oilfield workover operations, downhole pumping system, heavy oil production
- Reference model: 89-70/38TH5.6/1.2-0.9/5.1PZ
- Stroke length: 4m
- Tubing: 3.5” TBG
- Code: 30-275/150PF
- The technical attachment includes pump structure, parts list, catalogue information and drawings. Suppliers shall quote according to the attached technical specifications.
3. Quotation Requirements
Suppliers are requested to provide the following information in their quotation:
- Unit price and total price;
- Shortest delivery lead time;
- Brand, model and country of origin;
- Technical deviations, if any;
- Offer validity of at least 90 days;
- Quotation must be issued on the supplier’s official letterhead and stamped;
- All correspondence shall refer to SPEL-26-051.
4. Commercial Terms and Conditions
- Offer validity: 90 days;
- Delivery lead time: Shortest possible lead time;
- Country of origin: All origins are accepted;
- Packing: Bare in bundle or as per manufacturer’s recommendation;
- Payment terms: 45 days after receipt of supplier invoice and goods received at SPEL warehouse and accepted by the technical engineer;
- Price basis: Prices shall remain firm and fixed during purchase order execution;
- Quantity adjustment: Scimitar reserves the right to increase or decrease the quantity according to its needs;
- Delay penalty: 1% per week or part of week on delayed materials, up to a maximum of 5% of the total purchase order value;
- Inspection: Materials shall be subject to inspection if applicable.
Quote Now
All procurement inquiry information on this platform originates from documents submitted by the procuring party and is provided solely as a reference for industrial product supply and demand matching. It does not constitute any bidding commitment, guarantee, or endorsement. Before bidding, please proactively verify the authenticity, accuracy, and validity of key details such as demand specifications, qualification requirements, and deadlines with the tendering party. This platform reserves the right to modify or remove information at any time and shall not be liable for any losses arising from the use of the information.