en.Wedoany.com Reported - China National Energy Group has released the public tender announcement for the pile foundation construction of the 2×350MW cogeneration expansion (Build First, Retire Later) project of Heilongjiang Company's Guoneng Bei'an Thermal Power Co., Ltd. The name of this tender project is: Public Tender for Pile Foundation Construction of Heilongjiang Company's Guoneng Bei'an Thermal Power Co., Ltd. 2×350MW Cogeneration Expansion (Build First, Retire Later) Project. The project tender number is: CEZB260302178. The tenderer is Guoneng Bei'an Thermal Power Co., Ltd. The project unit is: Guoneng Bei'an Thermal Power Co., Ltd. The funding source is self-raised. The tender agent is China National Energy Group International Engineering Consulting Co., Ltd. This project has met the tender conditions and is now subject to a public post-qualification tender in China.
Project Overview, Tender Scope and Section (Package) Division: Project Overview: The investment entity of the Guoneng Bei'an Thermal Power Co., Ltd. 2×350MW cogeneration expansion (Build First, Retire Later) project (hereinafter referred to as this project) is Beijing Guodian Electric Power Co., Ltd. (a subsidiary of China National Energy Group). The newly established Guoneng (Bei'an) Power Generation Co., Ltd. is responsible for the project construction and operation, while Guoneng Bei'an Thermal Power Co., Ltd. is responsible for the preliminary project approval procedures. The two companies operate under the model of "one team, two brands".
Guoneng (Bei'an) Power Generation Co., Ltd. is located on the high slope south of the intersection of Yan'an Street and Qinghua Middle Road in Bei'an City, Heihe City, Heilongjiang Province, approximately 2 kilometers east of Bei'an Railway Station and about 1.5 kilometers north of the Wuyuer River. North of the site is Yan'an Street, north of which is the Qinghua New District residential area. South of the site is the Binbei Railway. West of the site is the existing Guoneng Bei'an 2×50MW cogeneration units (referred to as the existing units). East of the site is adjacent to the Bei'an City Health Industry Park. This phase of the project involves constructing 2×350MW supercritical wet-cooled coal-fired power plant cogeneration units on the east side of the existing site, with simultaneous construction of flue gas desulfurization and denitrification facilities. The outgoing lines will connect to the 220kV side of the Anbei 500kV substation via two 220kV lines. The preliminary plan for this project is for site preparation and leveling works to commence construction in April 2026. The main construction is planned to start with the pouring of the first concrete for the main powerhouse in July 2026. The construction period until the first unit's commissioning is 24 months. The commissioning date of the second unit is 2 months after the first unit. The first unit is scheduled for commissioning in July 2028, and the second unit in September 2028.
Tender Scope: Cast-in-place piles and artificial composite foundation treatment for all plant buildings and structures, including the main powerhouse, boiler house, primary heat supply station, central control building, chimney, dust collector, network control building, indoor GIS room, forced draft fan support, induced draft fan support, coal crusher house, transfer station, coal conveyor trestle, administration area buildings, desulfurization process building, absorption tower, ash silo, air compressor house, slag silo, demineralized water tank, cooling tower, etc. Composite foundations mainly include: chemical water treatment workshop, coal yard ground, equipment foundations with heavy loads, etc. This includes approximately 5028 Φ600 cast-in-place piles with a total pile length of about 122,075 meters; approximately 2500 cubic meters of CFG pile composite foundation; approximately 18,500 cubic meters of cement mixing pile composite foundation; and approximately 4300 cubic meters of bedding layer. The above foundation treatment quantities are only estimated values from the bidding scheme design stage, for reference only. The actual number and length of piles shall be based on the construction drawings. Refer to Chapter 7 Technical Standards and Requirements for details.
Construction Period: The contract duration is 2 years. Specific period requirements and start time are subject to the written notice from the tenderer.
Construction Site: East side of the existing site of Guoneng Bei'an Thermal Power Co., Ltd., Bei'an City, Heilongjiang Province
Bidder Qualification Requirements
The bidder must be an independent legal person or other organization legally registered, must provide valid proof documents, and possess a valid Grade I qualification certificate for specialized contracting of foundation engineering and a valid work safety permit. From March 2021 to the bid submission deadline, the bidder must have at least 2 contract performance records for cast-in-place pile foundation construction for thermal power units of 300MW grade or above. Proof documents for the required performance must be provided, including scanned copies of contracts. The scanned contract copies must at least include the stamped pages of both buyer and seller, the contract signing date, and key information pages related to the performance requirements. If the contract does not indicate the unit capacity and cast-in-place pile foundation construction, supporting proof materials must be attached; otherwise, the performance will not be recognized. The proposed project manager must provide a valid Grade I Constructor Practice Qualification Registration Certificate (Construction Engineering major) and a valid Work Safety Assessment Certificate (Category B), and must have at least 1 project manager work experience in cast-in-place pile foundation construction for thermal power generating units of 300MW grade or above. A contract proving the project manager's performance must be provided. If the contract does not include the project manager's name, corresponding acceptance certificates or user certificates with stamps must be provided as proof materials (must include project name, project manager, and company name). The proposed safety officer must provide a valid Work Safety Assessment Certificate (Category C). This project does not accept joint venture bids.
The deadline for bid submission (bid closing time) and bid opening time is 2026-04-20 10:00:00 (Beijing Time).
This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com









