Bilfinger Bags Cerulean O&M Work
Wedoany.com Report-Dec 19,Bilfinger has been appointed by Cerulean Winds to join the alliance of companies developing the Aspen, Beech and Cedar floating offshore wind farms.
Bilfinger will serve as operations and maintenance (O&M) partner across the +3GW portfolio.
“This is the story of the North Sea transition in a nutshell – a leading oil and gas service provider redeploying its skilled workforce and expertise to scale up floating wind,” said Dan Jackson, Founding Director of Cerulean Winds.
“Bilfinger is joining an alliance of exceptional companies united by a shared ambition to advance the floating offshore wind industry in Scotland and deliver clean power to the UK.”
Aspen, Beech and Cedar once built will comprise over 300 turbines.
The 1GW Aspen site will be developed first, providing new offshore wind capacity helping to meet the UK government’s 50GW by 2030 target.
Bilfinger will advise on O&M during the detailed design of the Aspen site, facilitating opportunities to adopt innovative technologies before delivering the O&M services once the development is built.
Sandy Bonner, president of engineering and maintenance UK at Bilfinger, said: “Being selected as the operations and maintenance partner for these pioneering floating wind farms is a significant milestone for us, which underscores our commitment to advancing renewable energy solutions and leveraging our extensive experience in the energy sector.
“By integrating innovative technologies and collaborating closely with the consortium, we aim to ensure the safe, efficient, and sustainable operation of the Aspen, Beech, and Cedar sites.
“Our early involvement in the design phase will allow us to optimise maintenance strategies and support the project's ambitious goals of industrial decarbonisation and enabling electrification of oil and gas facilities.
“We look forward to contributing to the success of these groundbreaking projects and driving forward the future of clean energy."
Related Products


Wind Power Tower Mold
Qinhuangdao Tianye Tolian Heavy Industry & Technology Co., Ltd.

"Shunyi 1600" Deep-submerging Bottom-sitting Multi-functional Wind Power Engineering Vessel
Zhengli Offshore Engineering Co., Ltd.

CITIC Heavy Industries Offshore Wind Power Equipment Hydraulic Pile Hammer
CITIC Heavy Industries Co., Ltd.
Wind Turbine Generator
Dongfang Electric Corporation Dongfang Electric Machinery Co., Ltd.

Pressurized Drilling Vertical Boring Machine
CCCC Tianhe Mechanical Equipment Manufacturing Co., Ltd.
2.7V 100000F (60wh) 60138 high-power energy storage power starting power supply (instantaneous high current), low-temperature discharge, long service life, 100000 times of use
Gonghe Power Co.,LTD










