BP33 Lithium Project in Australia Intersects 34.08m High-Grade Zone
2026-08-11 14:55
Favorite

en.Wedoany.com Reported - On August 11, Australian lithium miner Core Lithium disclosed that its first extensional exploration diamond drill hole NMRD100 at the BP33 project within the Finniss lithium operation intersected high-grade spodumene mineralization outside the current mineral resource boundary. From 578.70 meters downhole, it intersected 34.08 meters grading 2.09% lithium oxide, with an estimated true thickness of 28.50 meters; a further 3.43 meters grading 2.44% lithium oxide was intersected from 616.54 meters downhole.

Core Lithium

The 34.08m main zone contains multiple higher-grade intervals of 5.28m, 5.40m, 7.11m, and 9.83m, with lithium oxide grades ranging from 2.19% to 2.80%. NMRD100 is located near the previous drill hole NMRD085, which intersected a 90.17m zone grading 1.80% lithium oxide at a depth of 568.83 meters.

BP33 currently has a mineral resource of 10.5 million tonnes at an average lithium oxide grade of 1.53%. These results have not yet been included in the resource estimate, nor have they tested the exploration target of 3.9 to 6.5 million tonnes located down-dip of the current resource. Core Lithium plans to drill four additional holes to continue testing the mineralization extension along the dip and strike of NMRD085 and NMRD100.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com