Jammu and Kashmir, India Invests INR 800 Million to Build Mata Vaishnodevi Parikrama Road
en.Wedoany.com Reported - On November 17, the Government of Jammu and Kashmir, India, announced progress on the construction of the Mata Vaishnodevi Parikrama Road. The project has a total length of 38.325 kilometers and an estimated investment of INR 800 million (approximately RMB 68 million). The route encircles the Trikuta Hills and the area around the Mata Vaishnodevi Temple in Katra, connecting remote villages and towns in Reasi district and Udhampur district. The project is being implemented by the Jammu division of the Pradhan Mantri Gram Sadak Yojana (PMGSY). The contractor has been selected and the letter of acceptance is being processed. Earthwork construction will commence after the relevant procedures are completed, with a contract period of 3 years.

The route starts at Gran Morh near Reasi, passes through Gorta, Dandakote, Tote, Devigarh, Sukhal Ghati, and Devipindi, and finally connects to the Udhampur–Katra road near Panthal. The project adopts a combination of new alignment construction and upgrading of existing roads, with some sections utilizing the existing Reasi–Bamagh road to reduce duplicate construction.
According to the project implementation plan, the actual new construction begins at Pangalad near Tote, then proceeds through Sukhal Ghati and Devipindi to Panthal. The existing 32.9-kilometer road from Gran Morh to Pangalad will be upgraded simultaneously and widened according to road conditions. Approximately 19 kilometers of this section have already received funding for asphalt paving and road improvement, and 4 bridges are planned along the route. No tunnels are planned for the project; local ridge sections will be treated with road engineering measures according to terrain conditions.
Forest approval is the main issue that needs to be resolved before construction begins. Sections passing through Devigarh, Sukhal Ghati, Jangal Gali, and Devipindi traverse forest-covered areas, and some sections require forest land use permits. The project implementing department has communicated with the Jammu and Kashmir Forest Department regarding approval matters. At this stage, the contractor still needs to submit the required contract documents and bank guarantees, and complete the letter of acceptance procedures before on-site earthwork construction can begin.
In addition to the road itself, 9 temples dedicated to the nine goddesses (Nau Deviyan) are planned along the route. The relevant sites have been selected, and the parikrama road will connect these religious sites with the pilgrimage area around the Mata Vaishnodevi Temple. Once the road is completed, pilgrims can use the parikrama route to visit the temples along the way and surrounding villages and towns, reducing transportation accessibility constraints in remote areas.
The Bamagh area covered by the project has long been constrained by inadequate road transportation conditions. The villages and towns along the route are relatively dispersed, and some existing road sections require widening and improvement. After the new parikrama route and the upgrading of existing roads are completed, a continuous road corridor connecting Reasi, Tote, and the Panthal direction will be formed, improving travel conditions for local residents and the transportation of building materials and daily supplies.
The project will also enhance transportation convenience for pilgrims visiting surrounding villages and towns. New food service outlets, shops, and markets along the route can operate based on tourist traffic, creating linkages between road transportation and rural tourism support facilities.
Related Products




Pantograph-Catenary Comprehensive Detection Device (1C)
CHENGDU TANGYUAN ELECTRIC CO., LTD.
3m intelligent buoy combining navigation safety and real-time marine monitoring integrated navigation and marine monitoring system for real-time maritime data
Chengdu Dixin Technology Co., Ltd.
Wheel and Track Technology Business
Beijing Research & Design Institute of Rubber Industry Co., Ltd.
NTE150 Electric Drive Mining Dump Truck
Inner Mongolia North Heavy Industries Group Co., Ltd.













