Canada's 74-Year-Old Bulk Carrier Michipicoten Departs for Scrapping

2026-11-29 08:08
Favorite

en.Wedoany.com Reported - On November 27, the Canadian-flagged Great Lakes self-unloading bulk carrier Michipicoten departed Fraser Shipyards in Superior, Wisconsin, USA, towed by the 1953-built tug Anglian Lady, bound for Sault Ste. Marie, Ontario, Canada, where it is scheduled to be dismantled and recycled. The vessel had been moored at the shipyard since suffering structural hull damage in June 2024, and its departure from the yard marks the beginning of the end of its 74-year operational history.

Michipicoten was built by the American Bethlehem Steel Corporation and entered service in 1952, originally named Elton Hoyt 2nd and powered by oil-fired steam turbines. In 1957, the vessel underwent a hull lengthening conversion; in 1980, it was converted into a self-unloading bulk carrier equipped with an onboard unloading conveyor system capable of discharging bulk cargo independently. In 2003, the vessel joined the fleet of Canada's Lower Lakes Towing and was renamed Michipicoten; in 2011, it underwent a further propulsion system conversion, switching from steam to diesel power.

The vessel long served in Great Lakes iron ore transportation, primarily carrying iron ore pellets, and had also obtained grain transportation certification. The ship has a maximum cargo capacity of approximately 22,300 tonnes and is equipped with an approximately 76-meter-long unloading conveyor boom, enabling it to discharge bulk cargo without relying on large port-side unloading equipment. The converted diesel propulsion system uses a controllable-pitch propeller with a rated power of approximately 8,160 horsepower.

On June 8, 2024, while fully loaded with iron ore pellets and sailing on Lake Superior, Michipicoten suffered structural hull damage. Crew members heard abnormal noises and discovered the vessel was taking on water, then requested assistance from the U.S. Coast Guard. Rescue forces helped control the flooding and list, and the vessel eventually reached Thunder Bay, Canada, under escort. Subsequent underwater inspection found an approximately 4.6-meter-long crack in the hull, as well as structural cracks in internal bulkheads.

After completing temporary repairs, the vessel was approved for transfer in unpowered tow to Fraser Shipyards in Superior, Wisconsin, USA, for inspection. Due to the vessel's advanced age and high repair costs, the owner did not restore it to commercial service. Transport Canada subsequently confirmed that the vessel had not obtained permission to resume operations.

In November 2026, Sault Ste. Marie-based ship services company Purvis Marine acquired Michipicoten. The company operates a shipbreaking facility in Sault Ste. Marie and had previously dismantled the Mississagi, also part of the Great Lakes fleet. Following its departure from Fraser Shipyards, Michipicoten will be towed to the Canadian dismantling site, where the hull steel is reportedly planned to be recycled and supplied to Algoma Steel as feedstock for its new electric arc furnace.

Michipicoten was once one of the oldest bulk carriers still operating on the Great Lakes. Its retirement has once again drawn attention to the fleet renewal issue facing the Great Lakes' aging bulk carrier fleet. Currently, the S.S. Alpena, built in 1942, remains in service and has completed its 84th shipping season; the Wilfred Sykes, built in 1949, and the John G. Munson, built in 1952, also continue to carry freight on the Great Lakes.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com