Voltalia and TAQA Arabia to Develop 3 GW Wind Power and Photovoltaic Plant in Egypt
Wedoany.com Report-Nov 18, As the wind turbines near the end of their operational lifespan, Voltalia and TAQA Arabia have proposed a modern hybrid renewable energy solution.
Voltalia and TAQA Arabia have partnered to replace the capacity of the ageing Zafarana wind farm in Egypt with a 3 GW wind-solar photovoltaic complex.
In this regard, the two companies signed a memorandum of understanding (MOU) with Egypt’s Ministry of Electricity,
Zafarana wind farms were originally commissioned by the Government of Egypt two decades ago.
As the wind turbines near the end of their operational lifespan, Voltalia and TAQA Arabia have proposed a modern hybrid renewable energy solution.
This initiative will optimise land use on plots 5-8 of Zafarana, combining wind and photovoltaic technologies to achieve a total capacity of up to 3GW. The expected first commissioning is slated for 2028.
Under this partnership, the two companies will conduct comprehensive technical and environmental studies to establish a fully integrated green power facility.
Related Products


"Shunyi 1600" Deep-submerging Bottom-sitting Multi-functional Wind Power Engineering Vessel
Zhengli Offshore Engineering Co., Ltd.
Digital Multifunctional Electrical Measuring Instrument
Shanghai Complee Instrument Co.,Ltd.

2.7V 100000F (60wh) 60138 high-power energy storage power starting power supply (instantaneous high current), low-temperature discharge, long service life, 100000 times of use
Gonghe Power Co.,LTD




Wind Power Tower Mold
Qinhuangdao Tianye Tolian Heavy Industry & Technology Co., Ltd.
Ultrasonic Wind Speed and Direction Instrument
Kingmach Measurement & Monitoring Technology Co., Ltd.









