| Notice Type | Tender Announcement |
|---|---|
| Notice Number | POST/PEC/PEC/UZK/00055/2026 |
| Description |
I. Basic Points Tender Type: Service Project Name: Modernization of Valve Actuators for Unit 3 Procurement Method: Open Tender CPV Code: 51100000 (Installation services of electrical and mechanical equipment) II. Service Information Project Nature: Modernization of valve actuators for Unit 3 Scope of Work: Includes removal of existing valve actuators, supply, installation, commissioning of new actuators, and related installation services for electrical and mechanical equipment Technical Specifications: Detailed technical parameters, models, and performance requirements for the specific valve actuators are available in the tender documents (SWZ) and attachments. Bidders must strictly adhere to the technical specifications and standards outlined in the tender documents. Site Conditions: Work will be carried out within an operational combined heat and power (CHP) plant. Bidders must be familiar with industrial environment operational requirements and comply with on-site safety regulations. Quality Requirements: All installation work must comply with relevant Polish and EU industry standards and quality requirements to ensure long-term stable operation of the equipment. Materials and Equipment Information: Main Materials: Valve actuators (electric, pneumatic, or hydraulic type as per tender documents), including accompanying motors, controllers, cables, sensors, mounting brackets, and other accessories. Brand/Model: Tender documents may specify or recommend specific brands/models or allow bidders to propose equivalent alternative products. Spare Parts Requirements: Bidders must consider providing necessary spare parts and special tools. Specific lists are subject to the tender documents. Material Supply: Some installation materials (e.g., cables, piping, fasteners) may be supplied by the bidder. The specific scope is subject to the draft contract. Service Period: Up to 6 months Service Team Requirements: No requirement to provide employee names and qualifications. III. Implementation Conditions Project Duration: Up to 6 months IV. Contract Information Contract Duration: Up to 6 months V. Tender Requirements Tender Language: Polish Tender Submission Method: Electronic submission Consortium Bidding Requirements: Allowed, but a representative must be designated, and joint and several liability applies. VI. Bid Evaluation Rules Evaluation Method: Price is the sole criterion. Scoring Weight: Price 100% VII. Key Dates Bid Submission Deadline: 2026-04-08, 11:00 (UTC+02:00) Bid Opening Time: 2026-04-08, 13:00 (UTC+02:00) Bid Validity Period: 90 days |
| Documents |
Expired Tender for Valve Supply and Modernization for Unit 3 of PGE Energia Ciepła S.A., Poland
Favorite
| Organization | PGE Energia Ciepła S.A. | Country | Poland |
|---|---|---|---|
| Contact | Tel. | View more | |
| View more | Address | PGE Energia Ciepła S.A. Oddział Wybrzeże w Gdańsku - Elektrociepłownia Gdańska EC2 ul. Wiślna 6, Gdańsk, 80-555, Poland | |
| Release Date | 2026-03-17 | Validity | 2026-04-08 |
Details
The tender information on this website is provided for reference only. If you intend to bid, please verify the authenticity and accuracy of the information with the tendering party. Our company reserves the right to adjust website content at any time and assumes no direct or indirect liability for it.Email: news@wedoany.com
Related Tenders
Related Products
Pressure Vessels
Negotiable
CNG Tube Trailer
Negotiable
Mineral-insulated Compact Busway (Fire-resistant Busduct)
Negotiable /m
LVB Series 35-500kV Oil-immersed Inverted Current Transformer
Negotiable
CM On-Load Tap Changers
Negotiable
150t Integrated Sewage Treatment Equipment
Negotiable
Dual-Frequency Variable-Speed Brushless Generator
Negotiable
H-40.5/0.4~1.14kV New Energy Power Generation Dedicated High Voltage/Low Voltage Prefabricated Substation
Negotiable
ZT-6 Horizontal Directional Drilling and Pipe Laying Rig
Negotiable
Single-Phase Automatic Voltage Regulator(AVR)
Negotiable
GW4-40.5/72.5/126/145/170/252/363/420 Series Double-column Horizontal Rotary High-voltage AC Disconnect Switch
Negotiable
720/960kW Split Charging System
Negotiable