HIE Hydrogen Energy High-integration Equipment-HIE-ALK 4000
Negotiable
China
Ji'an Plaza, No.208 Andingmen Outer Street, Dongcheng District, Beijing City
0512-52997666
Online Contact
Favorite
Product Introduction
  1. High Integration

Four-in-one integrated design; 50%+ space savings; modular pipeline layout; enhanced system compactness

  1. High Intelligence

AI-driven automated control; remote cluster operation and maintenance; data-driven predictive optimization; 30% improvement in cold start efficiency

  1. High Standardization

Standardized production processes; modular architecture compatibility; rapid maintenance response; full lifecycle cost reduction

  1. High Safety

Redundant safety configurations; real-time gas leak warnings; multi-level interlocking protection; consistent purity of 99.99% throughout the process

Applicable Scenarios: Large-scale centralized green hydrogen projects, primarily in industrial sectors (petroleum refining, hydrogen metallurgy, green ammonia blending in thermal power, green ammonia/green alcohol production)

Operating Condition Information

Load Range: 30-110%

Operating Temperature: 90±2℃

Cold Start Time: ≤ 1H

Energy Consumption (DC): ≤ 4.4kw.h/Nm³

Output Information

Hydrogen Production: 100~500Nm³

Hydrogen Output Pressure: 1.6MPa

Initial Oxygen Concentration: >99.9%(v/v)

Product Oxygen Concentration: >99.999%(v/v)