The "Zhengli 3500" is the world's largest lifting capacity and most comprehensive operational capability vessel of its type to date, built by ZPMC. The platform is capable of transporting and constructing large-diameter monopile and jacket foundations, as well as installing 25MW wind turbines. It is suitable for unlimited navigation areas and meets the requirements for integrated offshore wind power construction in deep and distant waters.

Innovation Highlights

Maximum operating water depth: 70 meters

Capable of integrated piling and turbine installation, with self-flipping pile capability

Suitable for long-distance self-navigation, with a speed of 8 knots

Efficiency: According to domestic construction processes, a 10MW wind turbine (4-section tower) can be completed in just 48 consecutive hours

Deck capacity: Can accommodate simultaneous storage of 2 sets of 15MW wind turbines

Main hook lifting rate (unloaded) is 4 times that of full load

Largest pile gripper in China, adaptable to monopiles with diameters of 6.5–13 meters

World's largest lifting capacity for wind power installation platforms

World's longest leg length for wind power installation platforms

Product Parameters

Main parameters

Ship length

~ 143.8m

Type width

56.6m

Type depth

13m

Maximum operating water depth

70m

Load line draft

~ 7m

Speed

~8 KNOTS

Lifting system

Total length of spud leg

136m (including pile shoe height)

Lifting system

10000T/single leg, rated lifting force

21000T/single leg, static support force

Platform lifting speed

0.45m/min

Lifting speed of pile leg

0.7m/min

Deck area

Available deck area

~ 4800 ㎡

Maximum variable load

~ 8500T

Fan cargo capacity

2 sets of 15MW fans

Accommodation of personnel

Accommodation of personnel

150 people

Self-sustaining force

self-sustaining force

30 days/3000 nautical miles

Lifting system

Main crane

3500T @ 33M, double main (hook), lifting height 160M (above deck); Auxiliary hook 1200T, lifting distance: 180M (above deck)

Auxiliary crane

350T @ 30M, lifting height: 75M (above deck)

Propeller

Bow pipe tunnel propulsion

2 * 3000KW

Bow retractable thruster

1 * 3000KW

Stern full-turn propeller

3 * 3500KW

Dynamic positioning system

Dynamic positioning capability

DP-2

Power generation system

Main generator

6 * 3850KW

Emergency and mooring generator

1 * 1000KW

Helicopter deck

Maximum takeoff weight

8.6t

Pile holder

Pile diameter

6.5M-13M