Germany's GICON Grid-Connected 365-Meter Ultra-High Wind Power Prototype

2026-11-25 16:43
Favorite

en.Wedoany.com Reported - On November 19, German engineering company GICON held a commissioning ceremony for its ultra-high wind turbine (HWT) prototype in Schipkau, in the Lausitz region of Brandenburg, Germany. The unit has been connected to the grid and has begun generating electricity. The unit has a rated power of 3.8 MW, a hub height of 300 meters, and a maximum blade tip height of 365 meters, making it the tallest wind turbine in the world today.

The project is jointly advanced by the German Federal Agency for Breakthrough Innovation (SPRIND) and GICON. SPRIND subsidiary beventum commissioned GICON to build the project, which uses a 3.8 MW wind turbine generator supplied by Vensys with a rotor diameter of 126.2 meters.

To address the height limitations of conventional crane operations, GICON developed a double-layer steel truss structure consisting of a fixed outer tower and a telescopic inner tower. During construction, the wind turbine generator was first installed at a height of approximately 150 meters; the inner tower and the upper turbine assembly were then lifted as a whole to the target height using a strand hydraulic lifting system and locked into place, with the foundation and outer tower serving as the lifting support system. A groundbreaking ceremony was held in September 2024, and the final construction height of 365 meters was reached on September 28, 2026.

The project previously conducted a one-year on-site wind measurement campaign from May 2023 to May 2024 to study wind resource conditions at a height of 300 meters. According to GICON's estimates, the 3.8 MW prototype is expected to generate at least approximately 18 million kWh per year, roughly twice the output of a conventional wind turbine with the same rotor diameter.

After grid connection, the prototype will undergo operational monitoring and technical evaluation to study the effects of high-altitude wind resource conditions on the unit's operating loads and service life, and to verify through detailed measurements the technical feasibility of an operating life exceeding 20 years, providing data support for subsequent tower manufacturing, construction processes, and commercial unit design.

GICON is currently planning five additional ultra-high wind turbines and has obtained letters of intent for the construction of 100 such units in Germany. Future commercial units are planned to have a rated power exceeding 7 MW. Based on current market potential assessments, existing wind farms in Germany have the potential to add up to approximately 4,000 ultra-high wind turbines, utilizing the space above existing wind farms to increase generating capacity.

GICON plans to work with local small and medium-sized enterprises to advance the industrialization of ultra-high wind power technology, with mass production scheduled to begin by 2030 at the latest. By optimizing manufacturing and construction processes, it aims to reduce engineering construction costs, with the long-term goal of bringing the levelized cost of electricity below that of existing conventional onshore wind power.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com