Sri Lanka's Hambantota International Port Provides Shelter Berth for Cargo Ship with Engine Room Flooding

2026-11-26 10:09
Favorite

en.Wedoany.com Reported - On November 25, Sri Lanka's Hambantota International Port (HIP) completed the towage and berthing operation for the Cyprus-flagged general cargo ship "AAL Gibraltar." The vessel had previously lost its ability to navigate under its own power due to engine room flooding and was declared a disabled vessel, towed to Sri Lanka by the professional salvage tug "SPM Arjun." Hambantota Port deployed four harbor tugs to assist the vessel from the anchorage into the berth, providing shore-side support for subsequent repairs.

The "AAL Gibraltar" has a length of 159.99 meters and a deadweight tonnage of 25,732 tonnes. Prior to the incident, it was en route from Angola to another destination. After the engine room flooding, the vessel was unable to navigate under its own power and was carrying approximately 23,000 tonnes of cargo. The local agency Ceyline Maritime Services will coordinate the subsequent repair work. The vessel is currently berthed at a dedicated repair berth in Hambantota Port, with no clear departure time yet.

Prior to the formal berthing, Hambantota Port had provided maritime support to the vessel on three separate occasions. On September 23, the tug "Ravana" transported surveyors, technicians, and supplies to the vessel at a position approximately 12 nautical miles from the port; on October 13, the tugs "Pandukabhaya" and "Waruna" assisted the vessel for approximately 14 hours to refuel the main tug; on October 23, the "Waruna" again proceeded to waters approximately 12 nautical miles from the port to deliver repair spare parts to the vessel.

After obtaining a no-objection opinion from the Sri Lanka Merchant Shipping Directorate and following relevant recommendations from the Harbor Master and the Marine Environment Protection Authority, Hambantota Port was authorized to arrange the vessel's entry into port. In the final berthing operation, the port deployed four tugs — "Waruna," "Vasabha," "Ravana," and "Pandukabhaya" — which worked in coordination with the main tug "SPM Arjun" to complete the towage and maneuvering of the vessel from the anchorage to the berth.

This operation involved multiple stages including offshore resupply, technician transfer, spare parts delivery, towage, and berthing. While the vessel awaited port entry permission at sea, the port had continuously provided support; upon entering the berth, the vessel was able to access shore-side repair facilities and further technical support.

Hambantota International Port is located in southern Sri Lanka, approximately 10 nautical miles from the main east-west international shipping lane. The port offers services including afloat repairs, underwater operations, vessel surveys, supply delivery, bunkering, and temporary berthing, and is equipped with firefighting and rescue tugs on round-the-clock standby. The entry of the "AAL Gibraltar" further demonstrates its comprehensive service capabilities in providing maritime support, towage, and repair berthing for disabled vessels.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com