China Xiong'an 2090 Shallow Geothermal Wells Project Included in National-Level Pilot Program

2026-11-29 09:03
Favorite

en.Wedoany.com Reported - On November 26, PowerChina Geothermal Development Co., Ltd. announced that the Xiong'an PowerChina Smart City Geothermal Centralized Energy Supply Project has been included in the national pilot system for high-quality development and utilization of geothermal energy. The project is located in the Rongdong Area of Xiong'an New Area, with a total investment exceeding 100 million yuan. It plans to deploy 2,090 vertical shallow geothermal wells with a depth of 200 meters and build 6 energy stations, with a total energy supply area of 355,000 square meters.

The project is constructed in two phases, adopting a closed-loop buried pipe ground-source heat pump system, equipped with air-source heat pumps and chillers to handle peak loads, providing heating, cooling, and domestic hot water for office buildings, apartments, hotels, and commercial facilities in the park. The underground heat exchange system adopts a closed-loop circulation design and does not extract groundwater during operation.

The energy stations adopt modular design and standardized equipment configuration, and are connected to the "PowerChina Geothermal Cloud GIM+" smart energy management platform for real-time monitoring of cooling and heating loads, implementing regional energy dispatch and rock-soil thermal balance control. According to project calculations, the heating coefficient of performance (COP) reaches 4.5, and the cooling energy efficiency ratio (EER) reaches 5.8.

Phase II of the project commenced on September 17, 2025, with a total investment of approximately 37.21 million yuan. It plans to build 231 buried pipe heat exchange wells with a depth of 200 meters and 2 energy stations, serving an area of 111,200 square meters.

On November 15 this year, the project launched its heating service for the 2026–2027 season. Currently, heating services cover approximately 180,000 square meters of buildings, and Phase I has completed 4 heating and cooling cycles. Construction of Phase I Energy Station No. 4 and Phase II Energy Stations No. 5 and No. 6 will continue to be advanced.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com