| Notice Type | Tender Announcement |
|---|---|
| Notice Number | 128429-2026 |
| Description |
Website for Obtaining Tender Documents : https://www.meinauftrag.rib.de/public/DetailsByPlatformIdAndTenderId/platformId/1/tenderId/293090 Project Description :Construction of a complete power supply infrastructure for the new dairy barn project at the Teaching and Research Estate of the University of Munich (LMU) in Oberschleißheim. The scope of work covers the entire electrical connection from the existing medium-voltage system to the new cattle barn, including the construction of a new switchgear station, laying of medium and low-voltage cables, installation of a complete set of switchgear and transformers, and restoration of ground facilities. Switchgear Station Structure :1 concrete compact substation, consisting of 2 concrete chambers Medium-Voltage Switchgear :1 set, 4 bays, required to be SF6 gas-insulated (fluorine-free), including DC power supply and protection technology. Emphasis: This is a core equipment of the project and must be supplied strictly in accordance with the technical specifications. Transformers :2 units, 630 kVA cast resin transformers Low-Voltage Switchgear :1 set, low-voltage main distribution board (NSHV), 5 bays. Emphasis: This is a core equipment of the project, responsible for the internal power distribution of the farm. Medium-Voltage Cables :Approximately 1,000 meters (single-core) Low-Voltage Cables :Approximately 2,000 meters Cable Pits :Approximately 12 cable pulling pits Protective Conduits :Approximately 1,800 meters Earthworks :Approximately 800 cubic meters of cable trench excavation New Switchgear Station Construction :Construction of a compact substation consisting of 2 concrete chambers, including related excavation, foundation works, and grounding system installation. Medium-Voltage Switchgear Supply and Installation :Supply and installation of a 4-bay SF6 gas-insulated (fluorine-free) medium-voltage switchgear. This switchgear must integrate DC power supply equipment and complete relay protection technology. Transformer Supply and Installation :Supply and installation of 2 units of 630 kVA cast resin transformers, and completion of the primary-side (medium-voltage side) cable connection and wiring work for the transformers. Low-Voltage Switchgear Supply and Installation :Supply and installation of a 5-bay low-voltage main distribution board (NSHV) for the internal power distribution of the farm. Cable Duct Construction :Construction of a complete system of cable pulling pits and protective conduit pipelines for laying power and control lines. This system must extend from the new switchgear station to the connection point of the existing medium-voltage system on the estate. Road Surface Restoration :Upon completion of the works, all excavated asphalt road surfaces must be restored. Fiber Optic Connection :Laying of fiber optic lines to connect the new substation to the estate's central IT main distribution frame for communication and control. Contract Type :Construction Works Main Classification (CPV) :45315300 Electricity supply installations Construction Site :Oberschleißheim, St.-Hubertus-Straße 12, 85764, Germany Project Start Date :May 26, 2026 Project End Date :March 31, 2027 Budget :Not explicitly provided Bid Bond :Not applicable Performance Bond :Required, amount equal to 5% of the awarded contract value (including VAT, excluding subsequent changes). This requirement applies if the awarded contract value is at least 250,000 euros (excluding VAT). Defect Liability Period Bond :Required, amount equal to 2% of the total interim payments (i.e., the provisional settlement amount) at acceptance. Contract Conditions :Refer to tender documents for details Consortium :Permitted. The consortium must submit a declaration specifying the lead party and clarifying that all members are jointly and severally liable. |
| Documents |