Features:
Fully Automated Control: Positioning, formwork installation and adjustment, and concrete pouring can be monitored in real-time, with precise control based on preset paths and positioning accuracy requirements.
Short Installation Time: Reduces installation time by 20% (construction period shortened from 10 days to 8 days).
Intelligent Monitoring System: 3D digital monitoring platform for real-time monitoring of structural forces, deformation, and production parameters.

京公网安备 11010802043282号