SETTING UP
Big angle setting up with dual cylinders and sliding racks for a fast and reliable stand of beam for a rough work of unit.
WRENCH SYSTEM
Tri connection and movable of the wench system give a more strong and sturdy hold of rods so the work comes a easy and tiredless.
OPERATING STATION
The operating elements are clearly arranged and all functions and drilling parameters can be controlled without a problem via interactive control.
PIPE CENTERIZATION
The front pipe centering device make the rod more targeted for the drill and help the work success on the site.
