High-temperature dust removal integrated dry quenching waste heat utilization system
Negotiable
China
No. 188 Chuanguo Road, Industrial Zone, Jintang, Chengdu
+86 13547984589
Online Contact
Favorite
Product Introduction

The high-temperature dust removal integrated dry coke quenching waste heat boiler can be widely used in various dry coke power generation units

Technical features

Long life:
Reducing boiler wear, the service life of the waste heat boiler tube is increased from 4 years to 10 years

Water cooling protects the cyclone casting material, and the service life of the refractory material is increased

The service life of the dry quenching furnace bracket and the annular airway is increased

Cancel the multi-tube secondary dust collector and reduce the system failure points

High efficiency:
Using ultra-high temperature and ultra-high pressure parameters, the power generation per ton of coke is increased by 13%

The use of cyclone separation can create conditions for high parameters of the dry tank furnace

Environmental protection:
Compared with previous plans, it saves 30%~40% of land

The long life of the system can improve the dry quenching rate

parameter

Name

Medium temperature and medium pressure

high temperature and high pressure

High temperature dust removal integration (double super band reheater)

Tons of generated electricity (KWh)

130

150

170

Annual power generation (ten thousand KWh)

26520

30600

34680

Annual income from power generation (ten thousand yuan)

7956

9180

10404

Energy saving per ton of coke (KgCe/t)

41.6

48

54.4

Floor Area

Larger

Larger

30% to 40% savings

Service life of heating surface (years)

4

4

>> 10