Main performance:
① The traveling part and conveying part of the unit have manual and remote control functions;
② It is equipped with a crushing and transferring device and a large-capacity hopper. The transfer system can realize independent lifting and moving forward one step and other functions;
③ The unit is equipped with five drill arm devices, which are arranged in the front two, middle one and rear two modes according to their functions. It can carry out all-round roof and side wall anchor bolt and cable construction operations. Five sets of drill arms can operate at the same time to achieve one-time support forming;
④ The conveying part of the unit adopts a single middle chain scraper to avoid chain jamming and chain breaking to ensure continuous transportation of materials;
⑤ It can be equipped with an advanced support, a tunneling machine or a bolter roadheader to form a rapid tunneling system to realize parallel operations of digging, supporting and transporting.


京公网安备 11010802043282号