Wedoany.com Report-Dec 05, Trillion Energy announced the successful re-completion of the Akchakoja platform in the SASB gas field in Turkey.
The operation involved the installation of 2 3/8 velocity string in four existing Wells.
SASB, located in the southwest of the Black Sea, has produced more than 43 billion cubic feet of natural gas since 2007 and plays a vital role in easing Europe's energy crisis.
Trillion will redevelop the field with a development program of more than 17 Wells starting in 2022.
Phase B aims to complete six production Wells by the end of 2024, consisting of five development Wells and one formation well.
The new tubing operation was designed to reduce water content, increase production and improve the overall recovery of the well.
Trillion Energy announced the successful re-completion of the Akchakoja platform in the SASB gas field in Turkey.
The operation involved the installation of 2 3/8 velocity string in four existing Wells.
SASB, located in the southwest of the Black Sea, has produced more than 43 billion cubic feet of natural gas since 2007 and plays a vital role in easing Europe's energy crisis.
Trillion will redevelop the field with a development program of more than 17 Wells starting in 2022.
Phase B aims to complete six production Wells by the end of 2024, consisting of five development Wells and one formation well.
The new tubing operation was designed to reduce water content, increase production and improve the overall recovery of the well.









