Australia's PTR Minerals Completes Final Batch of Sample Testing for Titanium Project
en.Wedoany.com Reported - Australia's PTR Minerals has completed testing on the final batch of samples from the eastern portion of the Rosewood Titanium Project, located in the northern Gawler Craton of South Australia. The latest assay results released by the company indicate shallow, thick, high-grade heavy mineral mineralization.
Significant intercepts include: 9m @ 18.2% heavy minerals from 8m, including 6m @ 26.5% heavy minerals from 8m; 21m @ 8.7% heavy minerals from 3m, including 7m @ 12.8% heavy minerals from 5m; and 12m @ 12.2% heavy minerals from 6m, including 8m @ 17.3% heavy minerals from 6m.
PTR Minerals completed a total of 134 drill holes at Rosewood East during this drilling campaign. Testing of the remaining batch of samples from the Rosewood West project is ongoing. The company stated that assay data from the Rosewood West batch will be used to support a maiden resource estimate in the second quarter of 2026.
PTR Minerals is a critical minerals exploration company focused on discovering deposits in frontier and mature mining regions. The company plans to participate in the RIU Sydney Resources Round-up, to be held from May 5 to 7, 2026, at the Hyatt Regency Sydney.
This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com
Related Products

New Environmentally Friendly Green Potassium Salt Collector
Chonfar Engineering and Technology Co., Ltd.
Mine Explosion-proof and Intrinsically Safe Industrial Ethernet Ring Network (10 Gigabit/Gigabit)
Chongqing Mas Sci&Tech Co., Ltd.
Integrated Excavation and Anchoring Machine (EJM Series)
China Railway Construction Heavy Industry Corporation Limited
Comprehensive Mining Automation Control System
Beijing Tianma Intelligent Control Technology Co., Ltd.



Industrial and Commercial Point-Type Gas Detector
Jinan Benan Technology Development Co., Ltd.
Linyi Steel Investment Special Steel 2.7 Million Tons per Year High-quality Special Steel Project
Capital Engineering & Research Incorporation Limited
Quick-Change Single-Seat Control Valve / Quick-Change High-Pressure Single-Seat Control Valve
Beijing Consen Automation Technology Co., Ltd.
Hydraulic Plate and Frame Filter Press
Guangdong Leimeng Intelligent Equipment Group Co., Ltd.









