Two SmartROC D65 Autonomous Drill Rigs Introduced at Argentina's Vicuña Copper Project

2026-11-25 11:50
Favorite

en.Wedoany.com Reported - On November 23, Swedish mining equipment manufacturer Epiroc announced that it will supply two SmartROC D65 surface down-the-hole (DTH) drill rigs to the Vicuña copper project in San Juan Province, Argentina. The equipment is scheduled for delivery in mid-November 2026 to support mine development and drilling operations at the project. The Vicuña project is being jointly developed by a joint venture comprising BHP and Lundin Mining.

The SmartROC D65 is a DTH drill rig developed by Epiroc for surface mining, selective mining, quarrying, and large-scale civil engineering applications. It features an automated drilling cycle system that integrates multiple stages of the drilling process into a unified control flow. The equipment is primarily used for pre-split hole and production drilling operations, and can adjust operating parameters according to different drilling tasks, improving consistency and operational control throughout the drilling process.

The equipment supply also includes subsequent automation capability upgrades. Epiroc stated that once the communications network at the Vicuña project is operational, autonomous operation functions will be gradually introduced, enabling the drill rigs to advance from the current automated drilling cycle to a higher level of automated operation. The related technical upgrades will cover both pre-split drilling equipment and production drilling equipment, reducing the need for direct personnel involvement in certain on-site operations.

The Vicuña project comprises the Josemaría deposit in San Juan Province and the Filo del Sol deposit in the border region between Argentina and Chile, with primary minerals including copper, gold, and silver. The project adopts a phased development plan, beginning with the development of the Josemaría open-pit mine as the foundation, and subsequently integrating the Filo del Sol deposit and related ore processing, energy, and transportation infrastructure.

The introduction of the two SmartROC D65 drill rigs is part of the project's mining equipment configuration. As mine roads, communications networks, and other supporting infrastructure are gradually completed, the project plans to further enhance the level of drilling automation.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com