Drilling Results of 1,052.9 Meters Announced at the Urasar Mining Area in Armenia

2026-11-28 10:55
Favorite

en.Wedoany.com Reported - On November 27, the latest drilling results were announced at the Urasar mining area in northern Armenia. Hayasa Metals completed two diamond core drill holes in the western part of the mining area, with a cumulative footage of 1,052.9 meters. Both drill holes encountered strong hydrothermal alteration and stockwork mineralization characteristics, but copper and gold grades were generally low overall, and the core area of the porphyry-type mineralization system has not yet been intersected.

Among them, drill hole UDD-022 in the Oxide Basin target area reached a final depth of 622 meters, with an anomalous mineralized interval of 124 meters encountered within the hole depth range of 256 to 380 meters, averaging 0.04% copper grade and 0.035 g/t gold grade; within this, a 21-meter mineralized interval averaged 0.08% copper grade and 0.12 g/t gold grade, including a 4-meter mineralized interval averaging 0.33% copper grade and 0.35 g/t gold grade.

Drill hole UDD-023 in the Silica West target area reached a final depth of 430.9 meters, with a 1.2-meter mineralized interval averaging 0.2% copper grade, and another 8-meter mineralized interval averaging 0.05% copper grade; a 1.6-meter sample returned a silver grade of 19.6 g/t. All the above mineralized interval lengths are measured along the drill hole.

This round of drilling was carried out based on the results of audio-frequency magnetotelluric surveys completed in May 2026, covering 6 survey lines and 53 survey points, focusing on verifying low-resistivity anomaly targets in the western part of the mining area. Drill core revealed multiple stages of quartz–anhydrite stockwork veins, as well as pyrite, chalcopyrite, and minor enargite, with potassic alteration characteristics appearing in deeper rock layers.

The Urasar mining area covers approximately 34 square kilometers, and Hayasa Metals holds a 100% interest in the project. To date, a total of 23 drill holes have been completed at the project, with total footage exceeding 5,000 meters. The company is integrating existing exploration data and historical geological information, seeking partners for the next phase of exploration, and plans to announce follow-up exploration arrangements in early 2027.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com