125-Meter Mineralized Interval Drilled at Hugo North Copper Mine in Mongolia

2026-11-28 11:41
Favorite

en.Wedoany.com Reported - On November 27, the Hugo North Extension deposit of the Oyu Tolgoi copper-gold mine in Mongolia announced new assay results from seven underground infill diamond drill holes. Among them, hole UGD1025A returned a 125.31-meter mineralized interval averaging 1.28% copper, 0.270 g/t gold, and 3.18 g/t silver, for a copper equivalent grade of 1.45%.

The assay results were provided by Oyu Tolgoi LLC and relate to the underground infill drilling program conducted from 2023 to 2026, primarily targeting Lift 2 of the Hugo North Extension deposit, which is planned for development by block cave mining, to support geological modeling of the orebody and geotechnical studies.

Holes UGD918 and UGD918A returned mineralized intervals of 65.73 meters and 67.6 meters, with copper equivalent grades of 1.02% and 1.07%, respectively. Hole UGD757A returned a 136.3-meter mineralized interval with a copper equivalent grade of 0.84%; hole UGD1053, drilled primarily for geotechnical studies, returned a 527.7-meter mineralized interval with a copper equivalent grade of 0.51%. All of the above intervals are drill hole lengths, not true thicknesses of the orebody.

Oyu Tolgoi LLC also disclosed construction data for 14 underground drill holes and 2 surface drill holes, of which the underground holes within the joint venture mining license area totaled 3,826.4 meters and the surface holes totaled 1,770 meters. An additional 3 regional exploration drill holes were completed at the Ulaan Khud South and Heruga West exploration targets, totaling 2,060.9 meters, with assay work ongoing.

Entrée Resources and a Mongolian government working group held consultations on November 9-10 regarding state equity interests and mining license transfers related to the Shivee Tolgoi and Javkhlant mining licenses. The two parties aim to resolve the relevant issues in the first quarter of 2027, creating conditions for resuming underground development and mining operations of Lift 1 within the joint venture mining license area.

Oyu Tolgoi LLC completed updates to the resource models for Lifts 1 and 2 of the Hugo North deposit in the first half of 2026. Entrée Resources plans to complete a new technical report for the joint venture project in the first quarter of 2027, incorporating the updated resource models, underground mine plan, and production schedule.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com