The Changji-Guquan ±1100kV UHV DC Transmission Line is a "Xinjiang Electricity Transmission" line, starting from Changji in Xinjiang in the west and ending at Guquan in Anhui in the east, with a total length of 3,324 kilometers. It is the world's first ±1100kV DC transmission project and currently the world's UHV transmission project with the "highest voltage level, largest transmission capacity, longest transmission distance, and most advanced technology level."
1/1
Changji-Guquan ±1100kV UHV DC Transmission Line
Negotiable
China
No.405 Gengyun Road, Feixi Economic Development Zone, Hefei City, Anhui Province
0551-65729063
rongjieli1999@foxmail.com
Product Introduction
Other products from this supplier

Negotiable
Baihetan-Jiangsu ±800kV UHV DC Transmission Project

Negotiable
Ali Grid Interconnection Project

Negotiable
Yunnan Northwest - Guangdong ±800kV UHV DC Transmission Project

Negotiable
Ethiopia 500kV GDHA Transmission Line Project

Negotiable
Huainan-Shanghai UHV AC Transmission Yangtze River Grand Crossing Project (Anhui Power Eastward Transmission)

Negotiable
500kV Huaisu Substation

Negotiable
±800kV Beijing UHV DC Test Base

Negotiable
1000kV Jin Southeast-Nanyang-Jingmen UHV AC Transmission and Transformation Pilot Demonstration Project
Related Products
Optional Accessory - Auxiliary Sampling Module
Negotiable
Oil-immersed Amorphous Alloy Transformer
Negotiable
Stainless Steel Seamless Pipe
Negotiable
Grid-connected Inverter X1-MINI
Negotiable
Manufacturer Direct Sales Tesla New Energy Electric Vehicle Universal DC 180kW Dual-gun Charging Pile Commercial Fast Charger
Negotiable
Mars (Liquid Cooling) Series Industrial and Commercial Energy Storage Converter High Protection Module
Negotiable
Weichai Land-based Diesel Genset WPG110F1
Negotiable
CAP1400 main feedwater flow nozzle flowmeter.
Negotiable
SMART DC EV Charger
Negotiable
Jiujiang Pinggang 125MW Subcritical Gas Power Generation Project
Negotiable
QLG-12/24 SF GAS INSULATED RING MAIN UNIT
Negotiable
Pipeline Pipe
Negotiable
