The Ali Grid Interconnection Project is the fourth high-altitude power grid project constructed by State Grid Corporation of China that breaks through life-forbidden zones and challenges survival limits. It is also the world's highest-altitude and longest-distance ultra-high-voltage transmission and transformation project to date, with an average tower elevation of 4,572 meters, the highest elevation of 5,357 meters, and the longest transportation distance exceeding 5,400 kilometers. The company earnestly fulfilled its responsibilities as a state-owned enterprise, completing the delivery of 10,577 tons of tower materials 26 days ahead of schedule, and was rated as the "2019 Advanced Collective" by State Grid Tibet Electric Power Company.
1/1
Ali Grid Interconnection Project
Negotiable
China
No.405 Gengyun Road, Feixi Economic Development Zone, Hefei City, Anhui Province
0551-65729063
rongjieli1999@foxmail.com
Product Introduction
Other products from this supplier

Negotiable
Baihetan-Jiangsu ±800kV UHV DC Transmission Project

Negotiable
Yunnan Northwest - Guangdong ±800kV UHV DC Transmission Project

Negotiable
Changji-Guquan ±1100kV UHV DC Transmission Line

Negotiable
Ethiopia 500kV GDHA Transmission Line Project

Negotiable
Huainan-Shanghai UHV AC Transmission Yangtze River Grand Crossing Project (Anhui Power Eastward Transmission)

Negotiable
500kV Huaisu Substation

Negotiable
±800kV Beijing UHV DC Test Base

Negotiable
1000kV Jin Southeast-Nanyang-Jingmen UHV AC Transmission and Transformation Pilot Demonstration Project
Related Products
720/960kW Split Charging System
Negotiable
TianzhiⅡ tracking system
Negotiable
haohan Generation & Grid-side Energy Storage
Negotiable
Double-slide Triple-sealed Hot Air Isolation Door
Negotiable
Inductive Power Harvesting Self-Powered Device - Safuneng
Negotiable
TYC Series High-Efficiency Permanent Magnet Synchronous Motor
Negotiable
C80E General-purpose Open Wagon
Negotiable
Oil-immersed Amorphous Alloy Transformer
Negotiable
150t Integrated Sewage Treatment Equipment
Negotiable
Intelligent Cluster Charging Unit
40000-200000 /Set
Hydrogen Energy System Solutions
Negotiable
SDQ Hydrogen Production Series
Negotiable
