The 1000kV Jin Southeast-Nanyang-Jingmen UHV AC Transmission and Transformation Pilot Demonstration Project is a high-tech power construction project in China. As the country's first UHV power artery connecting four provinces in Central and North China, our company won the bid for the line towers in the fifth section of the project, becoming the only company in the nation to simultaneously construct both the UHV DC experimental base and the UHV AC transmission and transformation pilot demonstration project. On January 9, 2008, the National AC Project Construction Company issued a document praising our company's outstanding contribution to tower supply in the UHV project. The project was awarded the "100 Classic and Boutique Projects for the 60th Anniversary of the Founding of the People's Republic of China."
1/1
1000kV Jin Southeast-Nanyang-Jingmen UHV AC Transmission and Transformation Pilot Demonstration Project
Negotiable
China
No.405 Gengyun Road, Feixi Economic Development Zone, Hefei City, Anhui Province
0551-65729063
rongjieli1999@foxmail.com
Product Introduction
Other products from this supplier

Negotiable
Baihetan-Jiangsu ±800kV UHV DC Transmission Project

Negotiable
Ali Grid Interconnection Project

Negotiable
Yunnan Northwest - Guangdong ±800kV UHV DC Transmission Project

Negotiable
Changji-Guquan ±1100kV UHV DC Transmission Line

Negotiable
Ethiopia 500kV GDHA Transmission Line Project

Negotiable
Huainan-Shanghai UHV AC Transmission Yangtze River Grand Crossing Project (Anhui Power Eastward Transmission)

Negotiable
500kV Huaisu Substation

Negotiable
±800kV Beijing UHV DC Test Base
Related Products
CAP1400 main feedwater flow nozzle flowmeter.
Negotiable
Firefighting Robot
Negotiable
N-Type TOPCon Double-sided Cell HG183
Negotiable
Yingping Mining Section Open-pit Tailings Backfill Treatment of Goaf Ecological Restoration EPC Project
Negotiable
AI Safety Gas Meter
Negotiable
Horizontal-axis wind turbine
Negotiable
Power Transformer
1000000-1000000
FR2000H 2.15MWh (Air-cooled) 20-foot Containerized Energy Storage System
Negotiable
Mineral-insulated Compact Busway (Fire-resistant Busduct)
1000-50000 /m
Malaysia EMPP Gas Power Plant
Negotiable
Intelligent Cluster Charging Unit
40000-200000 /Set
LGG380K 3P Meter
Negotiable
