LNG Filling Station

Negotiable
China
No.1 Nansi Street, Huoxian Town, Tongzhou District, Beijing
+86 10 67383444
Online Contact
Favorite
Product Introduction

An LNG filling station is a service facility that unloads LNG feedstock from an LNG tanker truck into an LNG storage tank, and then fills LNG fuel into LNG vehicles through an LNG dispenser after pressure regulation. It consists of an LNG storage tank system, LNG cryogenic pump, unloading/storage tank pressurizer, EAG heater, dispenser, process piping, valves, and station control system, etc. The LNG filling station equipment developed by Tianhai Industry features mature process, reliable system insulation, good matching performance with vehicle bottle gas supply systems, zero venting loss operation, high degree of automation, and small on-site construction volume due to integrated pump skid design.

Product Parameters
Main Parameters Class III Station (Single Pump) Class III Station (Dual Pump) Class II Station Combined Station
Daily Filling Capacity (Nm³) >20,000 >20,000 >40,000 >60,000
Land Area (m²) 1,300 (2 mu) 1,300 (2 mu) 2,500 (4 mu) 5,000 (8 mu)
Daily Applicable LNG Vehicle Quantity (vehicles) <100 <100 <100 >300
Total Equipment Power (KW) <20 <40 <40 <150
Dispenser Metering Accuracy (%) ±1 ±1 ±1 ±1 and ±0.5
Pipeline Rated Pressure (MPa) 1.6 1.6 1.6 1.6/2.5
Single Vehicle Filling Time (minutes) 2~4 2~4 2~4 2~4
Filling Pre-cooling Time (seconds) <30 <30 <30 <30
Unloading Time (hours) <2.5 <2.5 <2.5 <2.5
Failure-free Working Time (hours) >5,000 >5,000 >5,000 >5,000