◇ Equipped with a 3D camera and visual servoing to ensure mortar level height, maintaining pressure on the wall to prevent hollowing.
◇ Automatic leveling system with verticality deviation of ±0.015°, ensuring perpendicularity of the working surface.
◇ Precision visual positioning ensures joint splicing accuracy of ±1mm, delivering smooth and natural wall transitions.
◇ Verticality and flatness meet high-precision wall standards, far exceeding conventional industry accuracy.
◇ Daily plastering of 300-350 sqm (current record: 708 sqm).
◇ Innovative trowel head design with built-in dual-layer scraper blades; after plastering and setting, a second leveling pass is performed to maintain surface finish.
◇ Actual plastering area on real projects has exceeded 4 million ㎡.
◇ Participated in the development of multiple industry group standards for construction techniques, leading the industry in construction quality.

