Mechanized Bridge Series: 51 m Mechanized Bridge

Negotiable
China
No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City
15827031509
+86 15827031509
Online Contact
Favorite

Product Introduction

Product Composition

The complete set of equipment consists of 1 launching vehicle, 6 bridge transport vehicles, 1 comprehensive support vehicle, and 1 set of bridge equipment.

Main Technical Parameters
Maximum obstacle width overcome by the bridge 48 m
Bridge traffic width 4 m
Traffic capacity Wheeled load axle pressure 13 t, tracked load 60 t
Complete bridge launching time 90 min
Complete bridge recovery time 150 min
Launching crew 6 persons
Bridge launching length 17 m, 25.5 m, 34 m, 42.5 m, 51 m
Height of bank height difference overcome by the bridge 3 m