China Coal Guangyuan 2×1000 MW Coal-Fired Power Generation Project Put into Operation
2026-06-28 10:19
Favorite

en.Wedoany.com Reported - On June 25, Unit 1 of the China Coal Guangyuan Coal-Fired Power Generation Project was officially put into commercial operation. The project is led by China Energy Engineering Group Southwest Electric Power Design Institute Co., Ltd. as the EPC general contractor, and the unit has completed a 168-hour full-load trial operation.

Located in Qingjiang Village, Baolun Town, Lizhou District, Guangyuan City, Sichuan Province, the project involves the construction of two 1,000 MW ultra-supercritical coal-fired generating units, with simultaneous construction of flue gas desulfurization and denitrification facilities. The project's smart infrastructure system was recognized as a five-star typical case of smart construction sites for 2025 by the China Electric Power Construction Enterprise Association.

The flue gas emission concentration of the project is superior to the national ultra-low emission standards, with dust, sulfur dioxide, and nitrogen oxides below 4, 20, and 24 mg/Nm³ respectively, achieving zero wastewater discharge across the plant. During the construction process, the project team has obtained 7 invention patents, 6 utility model patents, and multiple provincial and ministerial-level science and technology awards.

After being put into operation, the project is expected to generate over 9 billion kWh of electricity annually, helping to enhance the power supply guarantee capacity in the northeastern Sichuan region, alleviate local power shortages, and provide stable power support for industrial development and people's livelihoods.

This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com