en.Wedoany.com Reported - China Energy Engineering Group Co., Ltd. (CEEC) Zhongdian Engineering Consulting Company recently signed the EPC general contracting project for the Anyang 200MW/400MWh independent energy storage power station, continuously expanding its new energy storage business and supporting the green and low-carbon transformation of regional energy.
Located in Long'an District, Anyang City, Henan Province, the project has an overall construction scale of 200MW/400MWh. It adopts the industry mainstream lithium iron phosphate battery energy storage technology and is equipped with an efficient and energy-saving liquid cooling heat dissipation system to enhance the stability, safety, and service life of the energy storage system. The project also includes the construction of a new 220kV step-up substation, covering all professional supporting works such as primary and secondary electrical systems, communication, automation control, civil structure, fire protection, water supply and drainage, and HVAC.
Once completed and operational, the project will provide multiple key grid services, including peak shaving, frequency regulation, emergency backup, and demand response. It will help address issues such as insufficient flexibility and limited regulation capacity of traditional power systems, improve the safety, stability, and economic efficiency of grid operation, expand the capacity for local new energy consumption, and promote the construction of a new energy system in the core area of ecological protection and high-quality development of the Yellow River Basin.






