Algeria's ENGTP Advances Construction of 300,000 m³/day Seawater Desalination Plant

2026-11-16 11:06
Favorite

en.Wedoany.com Reported - On November 14, Noureddine Daoudi, Chief Executive Officer of Algeria's national oil company SONATRACH Group, visited the construction site of the Dahra Seawater Desalination Plant in El Marsa, Chlef Province, for an inspection. The project is being built by SONATRACH's subsidiary National Large-Scale Petroleum Engineering Company (ENGTP) and supervised by Algeria Desalination Company (ADC). Designed to produce 300,000 cubic meters of desalinated water per day, the plant will supply water to more than 3 million residents across four provinces—Chlef, Médéa, Aïn Defla and Tissemsilt—upon completion.

During the site inspection, SONATRACH management confirmed that construction progress is in line with the established schedule and required the participating units to strictly adhere to the contractual timeline and to strengthen construction process monitoring and quality control. The project involves major seawater intake, pretreatment, reverse osmosis desalination and treated water conveyance, and will subsequently require the completion of main facilities, electromechanical equipment and supporting pipeline networks, as well as system commissioning.

The Dahra project covers approximately 12 hectares and is an important component of Algeria's supplementary seawater desalination construction program. According to the construction arrangements announced at the project's initial stage, the works are implemented in phases, with the first phase designed to produce 150,000 cubic meters per day over a construction period of approximately 22 months, before gradually expanding to the final design capacity of 300,000 cubic meters per day. The final capacity is equivalent to approximately 109.5 million cubic meters of desalinated water per year.

Upon completion, the water supply service area will cover the four provinces of Chlef, Médéa, Aïn Defla and Tissemsilt, with a supply radius of approximately 150 to 250 kilometers. The facility will supplement regional urban water supply systems through centralized production of desalinated seawater, reducing local dependence on traditional water sources. The linkage between water resource development along the Mediterranean coast of Chlef Province and inland water supply needs is also an important aspect of the project's planning.

Construction is undertaken by ENGTP, with ADC responsible for project supervision. Both companies are subsidiaries of SONATRACH Group. On December 13, 2025, SONATRACH announced the official commencement of construction of the Dahra Seawater Desalination Plant; on December 29 of the same year, the relevant construction contract was signed. The project adopts an implementation model using Algerian domestic enterprises, and will create jobs during construction and subsequent operation phases, as well as provide training for seawater desalination technology and equipment maintenance personnel.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com