Lidl Germany Opens €132 Million Logistics Distribution Center in Bosnia and Herzegovina

2026-11-16 16:12
Favorite

en.Wedoany.com Reported - On November 12, German retailer Lidl officially opened its first logistics distribution center in Lepenica, Kiseljak, Central Bosnia Canton, Bosnia and Herzegovina. The project represents an investment of more than BAM 257 million, approximately €132 million, with a building area exceeding 64,000 square meters. The center features over 42,000 pallet storage positions, 140 loading docks, and 5 temperature-controlled zones. It is primarily responsible for centralized storage of goods, order picking, and distribution to retail stores, and is planned to provide supply chain support for the local retail network scheduled to launch in the first half of 2027.

The logistics center is divided into 5 temperature zones according to the storage requirements of different products, with temperature control ranging from minus 24°C to plus 18°C, covering frozen, chilled, and ambient products. Chocolate products have a dedicated storage room maintained at a constant temperature of 18°C. The multi-temperature zone design enables food products with different temperature requirements to be received, stored, picked, and distributed at the same logistics facility, reducing temperature fluctuations for cold chain products during warehousing and transfer.

Warehouse operations are equipped with a Pick-by-Voice system, through which staff receive instructions on product locations and order quantities via headsets, completing goods picking and consolidation according to store orders, reducing paper-based documentation. The center has 140 loading docks capable of organizing simultaneous loading and unloading of multiple batches of goods, with pallet storage capacity exceeding 42,000 positions and a designed supply range covering more than 100 stores. After centralized warehousing and order processing, goods will be scheduled for transport and distribution according to store requirements.

Approximately 10,000 square meters of solar panels are installed on the building roof, with an installed capacity of about 1 MWp, expected to meet approximately one quarter of the logistics center's electricity demand. The project has obtained international EDGE green building certification and is equipped with facilities for packaging waste sorting, recycling, and resource management. Packaging waste from the logistics center and Lidl stores will be centrally sorted at the facility before entering the appropriate recycling processes.

The project took approximately 18 months to complete, with about 70 local Bosnian companies participating in construction and equipment installation. After official opening, the center provides more than 200 jobs. The facility is located in the Azapovići commercial zone in Lepenica, Kiseljak, near the A1 highway, and will handle Lidl's centralized distribution operations across Bosnia and Herzegovina.

Lidl plans to open its first retail stores in Bosnia and Herzegovina in the first half of 2027. Once the logistics center is operational, goods will enter the store supply system through this centralized distribution base, covering the warehousing and transportation needs of local food, daily necessities, and imported products. The company currently cooperates with approximately 45 local suppliers, involving more than 450 product items.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com