Fortress Solutions to Integrate Train Control Wireless Network for New York City Subway Fulton-Liberty Lines
en.Wedoany.com Reported - On November 17, Fortress Solutions, a U.S. wireless communications infrastructure service provider, announced that it has joined the project team formed by Siemens Mobility and L.K. Comstock to provide dedicated wireless network design and integration services for the signal system upgrade of the New York City Subway Fulton-Liberty Lines. The project covers Brooklyn and Queens in New York, involving 23 stations and approximately 42 miles (about 67.6 kilometers) of track, and adopts Communications-Based Train Control (CBTC), with a designed minimum train headway of 90 seconds.

Fortress Solutions is responsible for radio frequency design, product planning and procurement, and network integration of the dedicated wireless network, establishing a communications support network for the Trainguard MT train control system provided by Siemens. The network must comply with the New York City Subway Interoperability Interface Specification (I2S) and provide real-time communications support for train position, speed, and operation control information. The system adopts 5G wireless communication technology and, through data exchange between trains and ground equipment, achieves continuous monitoring and dynamic control of train operating status.
Core equipment for the project is provided by Siemens Mobility, while L.K. Comstock is responsible for signal system installation and related infrastructure construction. Siemens will deploy the Trainguard MT system, integrating 9 subway interlockings across the two lines and replacing some existing track circuits with axle counters. The works also include replacing 94 switch machines, building 4 new train control rooms, and installing more than 1,200 kilometers of cable. Siemens previously disclosed that its train control system contract is worth nearly US$390 million (approximately RMB 2.6 billion), accompanied by a 25-year maintenance agreement with options to extend for two additional five-year terms.
In addition to the train control communications network, the upgrade project also includes passenger mobile communications coverage facilities. L.K. Comstock will be responsible for installing Distributed Antenna Systems (DAS) in underground sections along with supporting fiber optic cabling to provide passengers with 5G mobile communication services. The related works cover 62 underground track sections, involving 18 stations. The dedicated wireless communications network for train control and the passenger mobile communications coverage serve different system functions, respectively serving train operation control and passenger communication needs.
The Fulton-Liberty Lines upgrade is part of the Metropolitan Transportation Authority (MTA)'s large-scale signal and track renewal program, with a total investment of approximately US$1.9 billion (approximately RMB 12.67 billion), funded by New York congestion pricing revenue. The project route extends from High Street Station in Brooklyn to Ozone Park-Lefferts Boulevard Station in Queens, connecting 7 other subway lines, 36 bus routes, and the Long Island Rail Road, serving approximately 350,000 passengers along the corridor each weekday. Upon completion, the A and C lines will gradually adopt the next-generation train control system, replacing old signal equipment built in the 1930s and 1940s.
The main construction contract for the project was awarded to the L.K. Comstock and Railworks joint venture in December 2025, and Siemens announced in April 2026 that it had won the train control system contract. The New York State government announced on October 22, 2026 that the project had entered the implementation phase, with the overall works expected to be completed in the second quarter of 2032.





















