Alstom of France Delivers All 16 Traxx Passenger Electric Locomotives to Romania

2026-11-23 16:21
Favorite

en.Wedoany.com Reported - On November 19, Alstom of France officially delivered the last of 16 Traxx passenger electric locomotives to the Romanian Railway Reform Authority (ARF), completing delivery of all vehicles in accordance with the contract schedule. The procurement contract for this batch of locomotives was signed in 2024, with a total contract value of approximately EUR 150 million (approximately RMB 1.099 billion), covering 16 electric locomotives as well as 20 years of maintenance and repair services. Following completion of delivery, Romania's national railway passenger operator CFR Călători will gradually put all the locomotives into operation.

The locomotives delivered this time feature a four-axle electric drive configuration, with a design maximum speed of 200 km/h, an operating authorization maximum speed of 160 km/h in Romania, and the capability to haul up to 16 passenger coaches each. The vehicles adopt a multi-system electrical configuration capable of adapting to different railway power supply conditions, providing a technical basis for cross-border operation. The locomotives are equipped with Alstom's Onvia Cab onboard signaling system, which can exchange operational information with ground-based train control and signaling infrastructure.

The main technical application of this batch of locomotives is European Train Control System (ETCS) Level 2 train control. Unlike traditional train operation that relies on trackside signal displays, the ETCS Level 2 system continuously exchanges information between trains and ground signaling equipment via wireless communication, monitoring train position, movement authority and speed, and automatically applying braking when necessary. The system can improve train operation safety and enhance technical compatibility between railway networks in different countries.

On November 3, 2026, Romania achieved its first commercial passenger operation using the ETCS Level 2 system, on the section between Buftea and Brazi, part of the Bucharest–Budapest railway corridor, operated by CFR Călători. This operation combines Traxx locomotives equipped with onboard ETCS equipment with the ground-based digital signaling system, achieving a commercial operational link between modern locomotives and digital railway infrastructure.

Under the contract signed in January 2024, in addition to supplying 16 locomotives, Alstom is also responsible for 20 years of maintenance and repair services, and the two parties may extend the maintenance period by a further 20 years through a supplementary agreement. The related maintenance work is undertaken by Alstom personnel, and supporting dedicated maintenance facilities are currently being expanded. The long-term maintenance arrangement will cover vehicle inspection and repair as well as operational support, providing support for the continued use of the locomotives on long-distance passenger routes.

The first production locomotive was delivered in April 2026, and subsequent units arrived in Romania and entered operation progressively. The completion of delivery of the 16th locomotive marks the end of the manufacturing and delivery tasks for this batch of vehicles, with subsequent work focusing on the gradual entry of the fleet into operation and long-term maintenance support. Romania will use this batch of new electric locomotives to renew its existing passenger traction equipment and serve domestic long-distance and cross-border passenger train operations.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com