Dayone & Gaw Capital’s New Hyperscale Data Centre in Tokyo
Wedoany.com Report-Aug. 4, DayOne, a Singapore-based global data centre developer, and Gaw Capital Partners, a multi-asset investment firm, broke ground on the first phase of a hyperscale data centre campus in Fuchu City, Tokyo. Located in the Fuchu Intelligent Park, a key data centre hub near central Tokyo, the project is set to become one of the largest in the area, with a total IT capacity of 80 megawatts and a gross floor area of approximately 66,360 square meters.
DayOne’s CEO, Jamie Khoo, emphasized the project’s significance: “Today’s groundbreaking signifies the start of our inaugural project in Japan. This campus will deliver the foundational infrastructure needed to support the rapid growth of cloud, AI, and next-generation technologies in Japan and the region.” The initiative builds on DayOne’s successful expansion in Southeast Asia and strengthens its global presence.
The first phase involves constructing a nine-story building with ten data halls, offering an IT capacity of 18 megawatts. The facility, designed by NEC Facilities and built by HASEKO Corporation, is expected to be core and shell ready by mid-2027. It incorporates advanced cooling systems and renewable energy sources to enhance efficiency, aiming for certifications such as CASBEE, LEED, and ISO50001 Energy Management to support sustainability goals.
Nicholas Toh, Managing Director and Head of Data Center Platform, Asia (Ex-China) at Gaw Capital Partners, highlighted the project’s role in the region: “This groundbreaking event marks an important milestone in Fuchu City’s digital evolution. This collaboration merges Gaw Capital’s global real estate experience with DayOne’s expertise in operating high-performance data centres, illustrating our joint dedication to crafting a world-class infrastructure to meet the escalating data processing demands catalyzed by the rise of generative AI in the region.”
Greater Tokyo, a major digital hub with robust connectivity, is at the forefront of Japan’s data centre market, which is projected to grow significantly, reaching an estimated value of 2.24 trillion yen (US$14.88 billion) by 2027. The rising demand for data services, driven by advancements in AI and cloud technologies, underscores the importance of this development. The Fuchu City campus positions DayOne and Gaw Capital as key contributors to Japan’s digital infrastructure, supporting the nation’s growing data ecosystem and sustainable innovation.
Related Products

Hot Selling 10 Inch Intel N5100 I5 I7 FHD 8 +128GB 16+256GB Win10 Pro Win11 Pro 4G 5G Rugged Tablet PC Pad with NFC Barcode
Highton Electronics Co., Ltd.
Conveyor Belt Intelligent Monitoring System
LUO YANG WIRE ROPE INSPECTION TECHNOLOGY CO., LTD.
One-Stop Steward Service for the Entire Logistics System Integration Chain
Zhongding Intelligent (Wuxi) Technology Co., Ltd.
Comprehensive Mining Automation Control System
Beijing Tianma Intelligent Control Technology Co., Ltd.
G.652.D Wavelength-extended Non-dispersion Shifted Single-mode Optical Fiber
HONGAN GROUP CO., LTD.
D12 Humanoid Robot
Automation Research Institute Co., Ltd. of China South Industries Group Corporation
Automatic Aiming Laser Remote Obstacle Removal Robot
Pinggao Group Weihai High-Voltage Apparatus Co., Ltd.
Industrial and Commercial Point-Type Gas Detector
Jinan Benan Technology Development Co., Ltd.


Flat Portable Satellite Terminal 0.35m Aperture Manual Portable Terminal
China Starwin Science & Technology Co., Ltd.









