Australian BHM Company Advances Mine Restart: 25,000 Meters of Drilling to Resume Silver, Lead, and Zinc Production!
Australian-listed company Broken Hill Mines is accelerating preparations to resume operations at its Pinnacles silver, lead, and zinc mine in the Far West region of New South Wales, targeting initial production in the June quarter of 2026. This capital-efficient restart plan aims to supply ore to its underutilized Rasp processing plant located 15 kilometers away in Broken Hill.
To support the mine restart, BHM has signed mining services and ore transport contracts, completed key personnel hiring, and initiated surface preparations, including ramp upgrades and clearing of old facilities. Concurrently, the company has mobilized two drill rigs to site, planning to execute a total of 25,000 meters of infill and resource upgrade drilling. This program aims to expand the scale of existing high-grade resources and collect data necessary for mine design.
BHM is also continuing metallurgical optimization testing to determine the most efficient processing scheme for handling ore from multiple sources at the Rasp plant. The test results will provide crucial input for finalizing operational parameters ahead of production commencement.
Related Products


Industrial and Commercial Point-Type Gas Detector
Jinan Benan Technology Development Co., Ltd.


Comprehensive Mining Automation Control System
Beijing Tianma Intelligent Control Technology Co., Ltd.


KJ-3045 Crawler Mobile Jaw Crushing Station
Yunnan Kairuite Construction Machinery Equipment Co., Ltd.
Mine Explosion-proof and Intrinsically Safe Industrial Ethernet Ring Network (10 Gigabit/Gigabit)
Chongqing Mas Sci&Tech Co., Ltd.
DDW22/08SE-HORIZONTAL DIRECTIONAL DRILL
DW/TXS Construction Equipment (Beijing) Co., Ltd.

CYTJ45/2 Mining Hydraulic Tunneling Drill Rig
Zhangjiakou Xuanhua Huatai Mining and Metallurgical Machinery Co., Ltd.








