Czech Road and Motorway Directorate Tender for D0 510 Pučeničky Pond Bridge Construction Project

Organization Ředitelství silnic a dálnic s. p. Country Czech
Contact Mgr. Pavlína Morkusová Tel. Click to view
E-mail Click to view Address Čerčanská 2023, Praha 4, 14000
Release Date 2026-03-18 Validity 2026-04-02
Details
Notice Type Tender Announcement
Notice Number 189004-2026
Description

I. Basic Information

Tender Type: Works

Project Name: D0 510 Pučeničky Pond Bridge

Procurement Method: Open Tender

Project Description: The scope of works involves widening the D0 510 motorway, specifically the bridge sections designated as D0-007..1 and D0-007..2, to the modified D34.5/100 motorway width profile, including the addition of a slow lane and supplementary noise protection measures.

Construction Scope: Widening of the motorway section involving two bridges, addition of a slow lane, and installation of noise protection facilities.

CPV Code: 45221111 Road bridge construction work

II. Technical Requirements

Technical Specifications: In accordance with the tender documentation.

Quality Standards: In accordance with the tender documentation.

Warranty Period: Minimum requirement is 60 months, with a maximum of 120 months. Bids offering a warranty period less than 60 months will be excluded.

Environmental Standards: The contracting authority adheres to principles of environmentally responsible procurement.

Safety Standards: The contracting authority adheres to principles of socially responsible procurement, promoting fair working conditions.

III. Project Information

Project Scale: Motorway widening project.

Construction Standard: Modified D34.5/100 motorway category.

Construction Content: Bridge construction, road widening, addition of a slow lane, installation of noise protection facilities.

Project Type: Road and bridge construction.

Environmental Construction Requirements: The contracting authority adheres to principles of environmentally responsible procurement.

Safety Construction Requirements: The contracting authority adheres to principles of socially responsible procurement.

IV. Implementation Conditions

Construction Period: 25 months.

Project Implementation Phases: The works are divided into two parts, Sekce 1 and Sekce 2, each with independent completion time requirements.

Project Completion Time: The maximum allowable construction period for Sekce 1 is 252 calendar days, and for Sekce 2 it is 217 calendar days. Bids proposing a shorter construction period than the specified number of days will receive a scoring advantage.

V. Contract Information

Contract Value: The estimated value excluding VAT is CZK 1,307,235,375.00.

Payment Terms: In accordance with the provisions of the tender documentation.

Subcontracting Permitted: The contracting authority reserves the right, during contract performance and under specific conditions (e.g., early termination of contract due to contractor default), to award the contract to the next-ranked bidder from this tender as a replacement.

VI. Bidding Requirements

Bid Language: Czech, Slovak.

Bid Submission Method: Must be submitted electronically.

Bid Security: A bid security in the amount of CZK 15,000,000 is required.

Enterprise Qualification Requirements: In accordance with the selection criteria specified in the tender documentation.

Similar Project Experience Requirements: In accordance with the selection criteria specified in the tender documentation.

Consortium Bidding Requirements: Not explicitly prohibited, therefore considered permissible.

VII. Bid Evaluation Rules

Evaluation Method: Comprehensive scoring method.

Technical Scoring: Length of warranty period, construction period for Sekce 1, construction period for Sekce 2.

Commercial Scoring: Not separately listed; price is the sole commercial factor.

Price Scoring: Bid price.

Evaluation Criteria: Comprises four scoring criteria.

Scoring Weight Distribution: Price criterion weight 75%; Warranty period length weight 5%; Sekce 1 construction period weight 10%; Sekce 2 construction period weight 10%.

Comprehensive Scoring Formula: Price Score = 100 × (Lowest Bid Price / Evaluated Bid Price); Warranty Period Score = 100 × (Number of months the bid warranty period exceeds 60 months / 60); Construction period scoring formula is similar, calculated based on the difference from the specified maximum period for each section.

Minimum Technical Score Requirement: No explicit minimum total technical score is set, but there are mandatory minimum/maximum requirements for warranty period and construction period; non-compliance will lead to exclusion.

VIII. Key Dates

Tender Notice Publication Date: March 18, 2026.

Tender Document Access Start Time: Not specified; can be obtained from the designated website.

Tender Document Access Deadline: Not specified; likely related to the bid submission deadline.

Bid Submission Deadline: April 2, 2026, 10:00:00 (UTC+02:00).

Bid Opening Time: Conducted after the bid submission deadline, not public. Relevant information is typically published within 2 working days after bid opening.

Bid Validity Period: 10 months.

Documents Attachment.pdf
The tender information on this website is provided for reference only. If you intend to bid, please verify the authenticity and accuracy of the information with the tendering party. Our company reserves the right to adjust website content at any time and assumes no direct or indirect liability for it.Email: news@wedoany.com