It integrates multiple high-altitude operation functions such as arch frame installation, steel mesh laying, blasting charging, and rock bolt construction. It is suitable for construction operation schemes in highway and railway full-face method and benching method, including multi-arch prefabricated segmental erection, multi-arch prefabricated folding, single-arch folding, foot-locking rock bolts, systematic rock bolts, and advance rock bolts.
Safety
Equipped with three mechanical arms and three work platforms, prefabricated arch installation effectively prevents falling rocks and improves operation safety
High Efficiency
Equipped with a rock bolt arm, foot-locking rock bolts, systematic rock bolts, and advance small conduit construction can be carried out immediately after arch erection is completed, reducing equipment rotation time and improving operation efficiency
Multi-function
The extra-large work platform can accommodate 6-8 people simultaneously, enabling rapid completion of charging
Labor Saving
Only 4 people are needed to complete arch installation and steel mesh laying, saving 3-4 personnel
Convenient
Dual-power operation system, free switching between fuel and electric modes












