It is suitable for intelligent pouring of full-section or side-top arch of circular, horseshoe, and city-gate cross-sections in diversion tunnels, tailrace tunnels, and diversion tunnels of pumped storage power stations and water conservancy and hydropower projects.
Product Features
• The main frame adopts a hollow truss-type needle-beam structure, and the formwork adopts a box-type structure, featuring a simplified structure, high strength, and large internal space
• The use of a concrete layered distribution machine effectively improves the pouring quality of the secondary lining concrete, saves pouring time, improves operational efficiency, and reduces construction costs and safety risks
• Equipped with an information-based monitoring system, it monitors data such as the pouring position and pouring volume inside the trolley in real time, achieving process controllability and traceability












