[Crossing Fire Dikes, Securing the Lifeline]
When an emergency occurs at an oil depot, fire dikes become obstacles that prevent maintenance machinery and personnel from quickly accessing the site. This equipment can rapidly assemble a temporary passage in emergency situations, enabling various maintenance vehicles, equipment, and personnel to cross fire dikes and reach the core operation area at the earliest opportunity. It is also suitable for rapidly crossing obstacles such as small rivers and dry or wet gullies. One equipment serves multiple purposes, ensuring that emergency repair operations are no longer hindered by terrain barriers.
| Main Technical Parameters | |
| Total kerb mass | ≤32t |
| Overall dimensions (L×W×H) | 10m×3m×3m |
| Obstacle-crossing height | 2.5m |
| Total deployed bridge length | Approx. 34.5m |
| Load-bearing capacity | Wheeled load total weight 30t, wheeled load axle pressure 13t |
| Roadway width | 3m |
| Operating personnel (including driver) | ≤3 persons |
| Maximum gradability | ≥15° |
| Bridge erection time | 20min |
| Bridge retraction time | 30min |
| Erection method | Flip erection |
| Operating ambient temperature | -20°C~+46°C |
| Transportability | Meets highway transportation requirements; after disassembly, meets railway transportation requirements |












