Obstacle-Crossing Channel

Negotiable
China
No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City
15827031509
+86 15827031509
Online Contact
Favorite

Product Introduction

[Crossing Fire Dikes, Securing the Lifeline]

When an emergency occurs at an oil depot, fire dikes become obstacles that prevent maintenance machinery and personnel from quickly accessing the site. This equipment can rapidly assemble a temporary passage in emergency situations, enabling various maintenance vehicles, equipment, and personnel to cross fire dikes and reach the core operation area at the earliest opportunity. It is also suitable for rapidly crossing obstacles such as small rivers and dry or wet gullies. One equipment serves multiple purposes, ensuring that emergency repair operations are no longer hindered by terrain barriers.

Main Technical Parameters
Total kerb mass ≤32t
Overall dimensions (L×W×H) 10m×3m×3m
Obstacle-crossing height 2.5m
Total deployed bridge length Approx. 34.5m
Load-bearing capacity Wheeled load total weight 30t, wheeled load axle pressure 13t
Roadway width 3m
Operating personnel (including driver) ≤3 persons
Maximum gradability ≥15°
Bridge erection time 20min
Bridge retraction time 30min
Erection method Flip erection
Operating ambient temperature -20°C~+46°C
Transportability Meets highway transportation requirements; after disassembly, meets railway transportation requirements