Palsgaard Breaks Ground on Danish Solar Park
Wedoany.com Report-Mar 29, Food emulsifier company Palsgaard has broken ground on a solar park to be located near its factory in Juelsminde, Denmark.
The park will span 52 hectares and deliver an annual production capacity of 59GWh — enough to cover the energy needs of 12,000 households or fully power the operations of Palsgaard and its two project partners, JUAL and SP Moulding.
First initiated in 2019 and approved by local authorities in September 2024, the solar park is expected to become operational in early 2026.
Group chief executive and chairman of Palsgaard Anders Brix said: “We are proud to break ground on a project that perfectly reflects our ambition to take climate action seriously.
“This solar park will not only reduce our carbon footprint but also support our long-term goal of helping both our customers and the communities around us transition to a greener future.”
Related Products


Inductive Power Harvesting Self-Powered Device - Safuneng
SELF ENERGY TECHNOLOGY (SHENZHEN) CO., LTD.
VEG-12/24/40.5 Series Vacuum Circuit Breaker
SHANGHAI PINGGAO TIANLING SWITCHGEAR CO., LTD.

Hydrogen production and hydrogenation charging refueling gas integrated energy station
Shenzhen Kohodo Hydrogen Energy Co., Ltd.




Pneumatic high-pressure wear-resistant ball valve
Zhejiang Deca Control Valve Meter Co., Ltd.
MESS8201-2507/5015-BN Prefabricated Liquid-cooled Energy Storage Battery Container
Xuchang Xuji Electric Science Energy Storage Technology Co., Ltd.
YB □ -12/0.4/1250 Outdoor Prefabricated Substation (European Style)
Shangrao Shangyu Intelligent Electric Co., Ltd.








